Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 13, 2025 at 7:00 PM
Updated February 14, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Moscow, Idaho. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Question Deadline 01/27/2025 at 4:00 PM PT at 5:00 pm MDT is the last time technical questions or clarification request. Non-technical administrative support questions may be asked and answered via telephone or email until the time of bid submittal deadline, although there is no guarantee questions submitted City: Lenville County: Latah State/Province: ID Site Directions: The bridge is approx. 1.5 miles north of Lenville on Lenville Rd. Bridge KN 29666; Lenville Rd over Little Potlatch Creek Bridge Replacement Existing Bridge Key Number 29665 is located in Latah County and carries Lenville Rd over Little Potlatch Creek. The bridge is owned and maintained by South Latah Highway District and is located approximately 11.3 miles northeast of Genesee, ID. This proposal is for the contractor to remove the existing timber bridge and replace it with a single span pre-stressed concrete voided slab bridge with reinforced concrete abutments supported by piles. The road will be closed during construction and traffic will be detoured. Additional work includes road construction due to grade raise and permitted stream alterations including placing riprap Bridge removal and replacement.
Bid Results
Bridges / Tunnels
$1,296,468.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2025
March 31, 2025
Lenville Rd, Moscow, ID
Related To This Project
Moscow, ID
Bid Date: Feb 25 2025
Moscow, ID
Bid Date: Feb 11 2025
Moscow, ID
Bid Date: Feb 11 2025
Moscow, ID
Bid Date: Feb 11 2025
Moscow, ID
Bid Date: Feb 25 2025
Moscow, ID
Bid Date: Feb 25 2025
Moscow, ID
Bid Date: Mar 04 2025
Moscow, ID
Bid Date: Jan 21 2021
Moscow, ID
Bid Date: Jan 07 2025
Moscow, ID
--
Moscow, ID
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
