BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Renovation of a municipal facility in Winnipeg, Manitoba. Design plans call for the renovation of a municipal facility.

New equipment should be selected with low GWP refrigerants ( < 750) as per the most recent Greening Government Strategy. Integrate new equipment into the existing BAS, provide new sensors, devices, wiring, etc. as required and upgrade programming and graphics as necessary. Consultant to prepare performance specification (matching Chiller #2 performance) to pre-purchase the chiller and to expedite the delivery of the new chiller prior design plans and installation specification. Investigate options to replace the existing 250 ton air cooled screw chiller (CH-1). Chillers 1 is beyond its useful life and has had substantial refrigerant leaks over the past few years. Despite enhancing the preventative maintenance plans on the chiller and conducting substantial repairs, there is no way to guarantee this chillers will not continue to leak. In response to the state of the chillers 1, its likelihood to leak, and ECCC interest, PSPC and BGIS discussed options for an urgent project. PSPC is planning a larger HVAC project (GOC1824329). However, there is no timeline for the PSPC HVAC project, PSPC has informed BGIS that it could be 2-5 years at least or even more. The building can cool adequately in hot temperatures with two reliable chillers. The building requires 3 circuits to cool the building effectively and 4 circuits in more extreme heat. This summer was a good test with temperatures going up to 40 degrees Celsius. The chillers are used for thermal comfort; all data rooms have separate cooling units. New equipment should be selected with low GWP refrigerants (<750) as per the most recent Greening Government Strategy. Integrate new equipment into the existing BAS, provide new sensors, devices, wiring, etc. as required and upgrade programming and graphics as necessary. Consultant to prepare performance specification (matching Chiller #2 performance) to pre-purchase the chiller and to expedite the delivery of the new chiller prior design plans and installation specification. Chiller offloading is responsibility of chiller supplier. Chiller supplier responsible of securing the chiller (fencing, etc) until its installation takes place, visiting site periodically to ensure the chiller is in optimal conditions. Demolition of existing chiller and related components responsibility of installer. TIMELINE: An RFP for engineering has been awarded.

Design

Municipal

$240,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
48
Bidding Soon
542
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2026

Project location map

66 Stapon Rd, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.