BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2025 at 8:00 PM

Updated August 14, 2025

Site work, paving and outdoor lighting for a mixed-use development in Worcester, Massachusetts. Completed plans call for site work for a playground / park / athletic field; for paving for a sidewalk / parking lot; water / sewer project; sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

Work to include but not limited to: Demolition of ex. softball field, construction of new softball field: earthworks, precast concrete retaining wall, new electrical service, sodded turf field, irrigation, sport and pathway lighting, concrete flatwork, bituminous paving, chain link fence fabric and framework and associated site furnishing as noted in drawings and specifications. Bid Security (5% of Total Bid) Estimated Cost Base Bid = $ 3,700,000.00 All questions must be referred in writing to Jerry Kucera via e-mail at kucerajs@worcesterma.gov SUMMARY OF WORK a. The work to be completed under this contract involves the furnishing of all labor, materials and equipment for the following items of work and all incidentals thereto. All work shall be performed in full accordance with the specifications, other contract documents, obviously implied and necessary or under the direction of the Owner. b. The plans and specifications are intended to be cooperative, and any item called for in one and not the other shall be as binding as if called for in both. During the bidding period discrepancies should be immediately brought to the attention of the Owner for clarification. If a discrepancy is discovered within the plans and the specifications after the Bid period, the Owner will determine which shall apply. c. When Applicable, The City of Worcester DPW and DPRC will specify Project Standard appurtenances/amenities such as, but not limited to, park benches, trash receptacles, irrigation controllers, pedestrian, parking and sports field lighting, etc. in the facilities within their jurisdiction that are currently installed at this or other facilities. By standardizing, it provides the Division with a consistent product which through familiarity reduces operator training and maintenance time. Standardization also provides opportunities for maintenance cost saving through interchangeable parts such as but not inclusive to luminaries, ballast, poles, compatibility with current Division maintenance equipment etc. i. No substitution or equal will be accepted for the following item(s). 1. Pedestrian/Pathway lighting pole and fixture, Holophane. 2. Musco Sports Lighting System. d. Quality Control: To ensure the highest level of quality with respect to the playing surface of this greatly utilized public athletic facility, the General Contractor / Awardee shall have a minimum of five (5) years of successful experience. 1. as the Prime Contractor constructing (provide verifiable references upon request) 2. ability to demonstrate constructing (provide verifiable references upon request) 3. coordinating and supervising (provide verifiable references upon request) Park and Playground Improvements of similar size and quality of this Project as per the standards of the Project specifications and construction drawings All questions must be referred in writing to Jerry Kucera via e-mail at kucerajs@worcesterma.gov Question Deadline 07/25/2025

Award

Playgrounds / Parks / Athletic Fields

$2,857,000.00

Public - City

Outdoor Lighting, Paving, Site Work

31

24

33

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

September 30, 2025

Project location map

33 NE Cutoff, Worcester, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.