Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 17, 2025 at 7:00 PM
Updated February 6, 2025
Site work for a road / highway in Bristol, Wisconsin. Completed plans call for site work for a road / highway.
2025 Pavement Marking Project At: Various Locations County Wide A certified check or bid bond payable without condition to Kenosha County in an amount not less than five percent (5%) of the bid shall be submitted with each bid as a guarantee that if the bid is accepted a proper contract and bond will be executed and filed within ten (10) days after the acceptance of the bid. If such bidder fails to execute and file such contract and bond, the amount of the check or bid bond shall be forfeited as liquidated damages. The certified check or bid bond may be waived if only providing unit pricing on material supply Question Deadline 01/24/2025 at 3:00 PM CT Questions on the Contract documents or drawings shall be submitted to the County . Questions received after this deadline will be rejected. Answers to the received questions shall be sent via email to all Plan Holders by 3:00 p.m., January 29, 2025. All bidders must file a "Bidders Proof of Responsibility Form" with the Kenosha County Highway Commissioner on or before 3:00 p.m. on January 29, 2025 (Form PA-10). This requirement may be waived if a bidder has successfully completed a public works project on bid for Kenosha County within the previous five years. No bid shall be withdrawn after the opening of bids without the consent of the Kenosha County Department of Public Works for a period of sixty (60) days after the time of opening bids. Each bidder agrees upon submission of bid that if the same be accepted within said time period, they shall be bound by the terms of acceptance hereinafter contained. The Kenosha County Department of Public Works reserves the right to reject any or all bids received, or to accept any bid which may be most advantageous to, and in the best interest of Kenosha County. Each successful bidder will be required to furnish a satisfactory performance bond in the sum of the full amount of the contract. BASE BID: 5 EA - Mobilization Epoxy Work Areas 313,000 LF - Marking Line Paint 4-Inch Yellow 62,000 LF - Marking Line Paint 4-Inch White 102,000 LF - Marking Line Epoxy 4-Inch Yellow 133,000 LF - Marking Line Epoxy 4-Inch White 1,700 LF - Marking Line Epoxy 8-Inch White 11 EA - Marking Arrow Epoxy 8 EA - Marking Word Epoxy 290 LF - Marking Stop Line Epoxy 18-Inch 620 LF - Marking Diagonal Epoxy 12-Inch Yellow 14 MI - Locating No Passing Zones Epoxy Work Areas Together with appurtenant construction in all contracts. ** bid date info : All bids must be prepared on the proposal form included in the bid document and must be sealed and addressed to the Kenosha County Department of Public Works, and filed in the Office of the Highway Commissioner, 19600 75th Street, Suite 122-1, Bristol, WI 53104. There shall appear on the envelope of each bid, the name and address of the bidder and purpose for which the bid is intended
Post-Bid
Roads / Highways
$200,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2025
March 17, 2025
Multiple Locations, Bristol, WI
Related To This Project
Bristol, WI
Bid Date: Feb 05 2025
Bristol, WI
Bid Date: Feb 05 2025
Bristol, WI
Bid Date: Feb 05 2025
Bristol, WI
Bid Date: Feb 14 2025
Bristol, WI
Bid Date: Mar 19 2025
Bristol, WI
Bid Date: Apr 01 2025
Bristol, WI
Bid Date: Mar 20 2025
Bristol, WI
Bid Date: Jan 29 2025
Bristol, WI
Bid Date: Sep 19 2024
Bristol, WI
Bid Date: Jan 14 2025
Bristol, WI
Bid Date: Mar 11 2025
Bristol, WI
Bid Date: Jul 31 2024
Bristol, WI
Bid Date: Jun 18 2024
Bristol, WI
Bid Date: Mar 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
