Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 3, 2025 at 7:00 PM
Updated August 5, 2025
Site work and paving for a sidewalk / parking lot in Woburn, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Project consists of : Replacement of approximately 14,000 square feet of asphalt paving at Parking Lots A & B at the 19 - 1 Spring Court Extension Housing Development, as shown on the drawings, including all related work. a. Repair of all existing lawn areas damaged during the work b. Protection of the existing underground sprinkler system throughout the development. c. Contractor shall repair/replace sprinkler heads, piping, etc. damaged during the work. Alternate No. 1 - Replacement of approximately 7,600 square feet of asphalt paving at Parking Lot C at the 19-1 Spring Court Extension Housing Development, as shown on the drawings, including all related work. Alternate No. 2 - Replacement of approximately 11,800 square feet of asphalt paving at Parking Lot D at the 19-1 Spring Court Extension Housing Development, as shown on the drawings, including all related work. Alternate No. 3 - Replacement of approximately 6,000 square feet of asphalt paving at Parking Lot E at the 19-1 Spring Court Extension Housing Development, as shown on the drawings, including all related work. Alternate No. 4 - Replacement of approximately 8,300 square feet of asphalt paving at Parking Lot F at the 19-1 Spring Court Extension Housing Development, as shown on the drawings, including all related work. General bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (considering all alternates) and made payable to the Woburn Housing Authority. The work is estimated to cost $ 540 ,000 .00 ( Base Bid : $160,000.00 - Alternates : $380,000.00). General bidders must agree to contract with minority and women business enterprises as certified by the Supplier Diversity Office (SDO), formerly known as SO MWBA. The combined participation goal reserved for such enterprises shall not be less than 10.4% of the final contract price. MBE (15.3%), WBE (6.9%)
Bid Results
Sidewalks / Parking Lot
$94,500.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2025
March 3, 2025
100 Spring Ct Ext, Woburn, MA
Related To This Project
Woburn, MA
Bid Date: Apr 10 2025
Woburn, MA
Bid Date: Apr 30 2025
Woburn, MA
Bid Date: Mar 27 2025
Woburn, MA
--
Woburn, MA
--
Woburn, MA
Bid Date: Apr 16 2025
Woburn, MA
--
Woburn, MA
--
Woburn, MA
--
Woburn, MA
--
Woburn, MA
Bid Date: Dec 13 2024
Woburn, MA
Bid Date: Oct 23 2024
Woburn, MA
Bid Date: Oct 30 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
