Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 22, 2025 at 8:00 PM
Updated April 23, 2025
Site work and paving for a mixed-use development in San Jose, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Martial Cottle Park Perimeter Trail Extension Installation of a new 0.5-mile long 12-foot wide asphalt paved Class A trail segment around the southeast corner of the park and a new 0.5-mile long 12-foot wide natural surface rocked trail segment of the Perimeter Trail around Field C for a total of 1 mile of new trail that would result in completion of the Perimeter Trail around the entire Martial Cottle County Park. Scope includes: associated tree pruning, protection, and removals, excavation, grading and earthwork, installation of aggregate base rock, asphalt and concrete pavements, fence and gate removal and installation, drainage infrastructure, site furnishings, signage, and streetscape improvements within the Right-Of -Way along Chynoweth Ave, and increased Americans with Disabilities Act standard parking. The Project will provide improved access to the adjacent farmstand commercial facilities while providing improved and safer recreational access for the public. The new segments of trail will connect to the park's existing Perimeter Trail within the historic Cottle and Lester Historic Ranch site. The first proposed segment will run from the main park entrance on Snell Ave, south around the existing farmstand, and then west along Chynoweth Ave, connecting to the existing trail along Chynoweth Ave at the intersection of Avenida Almendros. The second segment will run from the pump house south across the Canoas Creek Bridge, around Field C connecting to the Route 85 underpass, and completing the Perimeter Trail around the park. The contract includes 3 bid alternates: 1) Split Rail Fencing from Branham Ave south to the main park entrance, 2) Split Rail Fencing from the main park entrance south to the farmstand, and 3) Field C trail improvements as shown in the construction documents. Question Deadline 02/03/2025 at 2:00 PM PT Inquiries must be addressed to the Project Manager with a copy to Owners Authorized Representative Description: 12' wide AC trail, approximately 0.5 miles long Contract duration: 210 days
Award
Roads / Highways
$1,179,408.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2025
April 14, 2025
5283 Snell Ave, San Jose, CA
Related To This Project
San Jose, CA
Bid Date: Jan 24 2025
San Jose, CA
Bid Date: Feb 13 2025
San Jose, CA
Bid Date: Feb 06 2025
San Jose, CA
Bid Date: Mar 20 2025
San Jose, CA
Bid Date: Feb 13 2025
San Jose, CA
--
San Jose, CA
Bid Date: Feb 04 2025
San Jose, CA
Bid Date: Feb 13 2025
San Jose, CA
Bid Date: Jan 29 2025
San Jose, CA
Bid Date: Feb 20 2025
San Jose, CA
Bid Date: Jan 16 2025
San Jose, CA
Bid Date: Feb 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
