BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2025 at 8:00 PM

Updated March 11, 2025

Site work for a water / sewer project in Carbondale, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000373013 Job Location: Pitkin County, CO Pitkin County is qualifying interested parties for the provision of ditch improvement construction services at the Coke Oven Open Space located at 17807 Colorado 133, Carbondale, CO, 81623. Question Deadline 02/07/2025 at 4:00 PM MT Questions are submitted online No, Any and all questions, or requests for clarification, must be submitted by time. Questions and requests for clarification will only be accepted via email at procurement@pitkincounty.com. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Performance Bond 50 % PROJECT OVERVIEW Coke Ovens Open Space is located in Redstone, Colorado, and includes approx. 80 acres, which includes flood irrigated agriculture. The agricultural water source is the Beaman Ditch (ditch), which Pitkin County is the only user. The ditch is currently an earthen ditch that supplies a 1.3cfs water right to the Coke Ovens property, with Coal Creek as the source. The project will consist of two phases, head gate replacement and ditch piping. 1. The head gate needs to be replaced and improved to prevent leaking water during periods when the ditch is not operating. 2. There is approximately 700 ft of the Beaman Ditch that runs on the western side of Coal Creek Road that has a history and is at risk of leaking or blowing out during runoff and the irrigation season. We would like to pipe the hazardous sections of this ditch to prevent future damage and hazard to Coal Creek Road. There is an additional 300 ft of the Beaman ditch that is a medium priority to pipe, however depending on project budget, may or may not be installed. The project scope can be broken into two main objectives, preliminary diagrams can be found in Attachment A: Head Gate Replacement: Removal and disposal of the existing head gate, procurement of new head gate infrastructure, and installation of the new head gate. This phase of the project will include working with SGM Engineering and Pitkin County staff throughout the process. Beaman Ditch Improvement: Piping sections of the Beaman Ditch that permits water flow, clean out, and water measurement during the irrigation season. The piped section is engineered to be 18". This project will include procurement and installation of a flume to measure water flow, procurement and installation of approximately 700 ft of piped section, and burying the piped section. This phase of the project will include working with SGM Engineering and Pitkin County staff throughout the process. Improve diversion ond heodgote for Beaman Ditch off of Cool Creek, Pipe segments of the Hillside ditch in steep hillside section below diversion.

Post-Bid

Water / Sewer

$400,000.00

Public - County

Site Work

11

3

17

5

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
23
Bidding Soon
241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2025

March 31, 2025

Project location map

17807 CO-133, Carbondale, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.