BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2025 at 7:00 PM

Updated March 4, 2025

Site work and paving for a mixed-use development in Omaha, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

for furnishing all labor, tools, materials, and equipment required to perform 2025 STREET RECONSTRUCTION, for Sanitary and Improvement District No. 530, Douglas County, Nebraska, as per the plans and specifications for said work. and at the locations shewn on the detailed drawings and in the specifications now on file with the Clerk of said District and available at the office of E & A Consulting Group Inc., which proposals are as received will, at that time, be publicly opened, read aloud, and tabulated. The work consists essentially of the following estimated quantities: APPROXIMATE QUANTITIES Bid Item DESCRIPTION QUANTITY UNIT 1 Concrete Pavement Repair, Large Area 2,325 SY 2 Concrete Pavement Repair, Smail Area 743 SY 3 Full Depth Saw Cut Existing Pavement 3181 LF 4 Adjust Manhole to Grade 7 EA 5 Remove and Replace PCC Sidewaik 192 SF 6 Remove and Replace PCC- Curb Ramp 42 SF 7 Construct Detectable Warning Panel (1 Locations) 8 SF 8 Remove and Replace Faulty Subgrade 25 TN 9 Adjust Sprinkler (As Needed) 5 EA The amount ofthe engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, and miscellaneous costs) is $285,000.00. All proposals must be submitted on bid forms furnished by E & A Consulting Group, Inc.., and must be accompanied by an original bid bond or a certified check in the amount of not less than $14,250.00 made payable to the Treasurer of Sanitary and improvement District No. 530 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor, and will give a contract arid maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bends must be executed by a duly licensed corporate surety, Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of THIRTY (30) days after date setter opening of bids. All proposals must be enclosed in an envelope, sealed, and addressed to the Clerk of Sanitary and Improvement District No. 530, and sheLI be marked "2025 Street Reconstruction", with ths bidder's name and address on said envelope. The bid security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked "BID SECURITY" with the project identified thereon. Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. The work herein provided shall be done under written contract with the responsible bidder submitting the lowest acceptable bid in accordance with the requirements of the plans and specifications and as provided by law. Plans, specifications, and contract documents governing the above-referenced proposal as prepared by E & A CONSULTING GROUP, INC., 10S09 MILL VALLEY ROAD, SUITE 100, OMAHA, NEBRASKA, are hereby made a past of this notice. The proposed contract shall be executed in compliance therewith. Sanitary and Improvement District 530 of Douglas County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities. SANITARY AND IMPROVEMENT DISTRICT 53Q OF DOUGLAS COUNTY, NE

Award

Roads / Highways

$213,298.00

Public - County

Paving, Site Work

7

7

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
1
Bidding Soon
500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2025

March 19, 2025

Project location map

Multiple Locations, Omaha, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.