BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2025 at 7:00 PM

Updated February 1, 2025

Site work for a water / sewer project in Tewksbury, Massachusetts. Completed plans call for site work for a water / sewer project.

Installation of approximately 7,200 linear feet of 8" and 6" ductile iron water main, approximately 2,100 linear feet of HDPE service piping, fittings, fire hydrants, ductile iron gate valves, temporary water main bypass system and other related water system work on Pringle Street, Pomfret Road, County Road, Grove Street, South Street and Salem Road. Additional work includes approximately 550 tons of temporary trench paving, 1,900 tons of permanent trench paving, and all other related work as specified. Estimated Cost $2,850,000. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

Post-Bid

Water / Sewer

$2,850,000.00

Public - City

Site Work

17

12

2

2

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
556
Active Projects
207
Bidding Soon
4,314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2025

March 31, 2025

Project location map

Multiple Locations, Tewksbury, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.