Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 23, 2025 at 8:00 PM
Updated May 24, 2025
Site work, new construction and renovation of a mixed-use development in Oakland, California. Completed plans call for the construction of a power facility; for the renovation of a power facility; for site work for a power facility; transportation facility; transportation facility; and transportation facility.
The Port seeks to select a Design-Build contractor based on the "Best Value" approach. This method combines both the technical merit and the cost-effectiveness of each proposal to determine the most advantageous offer. : Questions/RFI Response Date with: “May 1, 2025” This project falls under the Labor Code definition of "Public works" (Cal. Labor Code Section 1720 et seq) and will be subject to compliance monitoring and enforcement by the Department of Industrial Relations ("DIR"). Proposers submitting a proposal, and subcontractors or subconsultants performing any portion of the work that falls under the "public works" definition, must be registered with the DIR pursuant to DIR requirements prior to submission of the proposal, and the Proposer must include in its proposal its own DIR registration number and the DIR registration numbers of all listed subcontractors and subconsultants that will participate in the "public works" portion of the scope of services. Two 12kV Substations, one 5kV Substation, associate low voltage switchgear, approximately 6,000 feet of new ductbank, IT infrastructure, structural and foundations, and other site work. Approximate value: $60M to $90M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidders and interested parties may also participate in the meeting via teleconference at 1 669 900 9128. At the meeting, the Port will provide information related to the Port's insurance requirements, NDSLBUP requirements, and will answer questions regarding the proposed project, submittal requirements and the selection process.
Post-Bid
Power Plant
$90,000,000.00
Public - City
New Construction, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2025
September 30, 2025
1 Airport Dr, Oakland, CA
Related To This Project
Oakland, CA
Bid Date: Feb 26 2025
Oakland, CA
Bid Date: Feb 24 2025
Oakland, CA
Bid Date: Feb 04 2025
Oakland, CA
Bid Date: Feb 12 2025
Oakland, CA
Bid Date: Feb 13 2025
Oakland, CA
Bid Date: Feb 11 2025
Oakland, CA
Bid Date: Apr 22 2025
Oakland, CA
Bid Date: Feb 10 2025
Oakland, CA
Bid Date: Aug 18 2020
Oakland, CA
Bid Date: Jan 15 2025
Oakland, CA
Bid Date: Feb 04 2025
Oakland, CA
Bid Date: Jan 23 2025
Oakland, CA
--
Oakland, CA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
