BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Site work, new construction and renovation of a mixed-use development in Oakland, California. Completed plans call for the construction of a power facility; for the renovation of a power facility; for site work for a power facility; transportation facility; transportation facility; and transportation facility.

The Port seeks to select a Design-Build contractor based on the "Best Value" approach. This method combines both the technical merit and the cost-effectiveness of each proposal to determine the most advantageous offer. : Questions/RFI Response Date with: “May 1, 2025” This project falls under the Labor Code definition of "Public works" (Cal. Labor Code Section 1720 et seq) and will be subject to compliance monitoring and enforcement by the Department of Industrial Relations ("DIR"). Proposers submitting a proposal, and subcontractors or subconsultants performing any portion of the work that falls under the "public works" definition, must be registered with the DIR pursuant to DIR requirements prior to submission of the proposal, and the Proposer must include in its proposal its own DIR registration number and the DIR registration numbers of all listed subcontractors and subconsultants that will participate in the "public works" portion of the scope of services. Two 12kV Substations, one 5kV Substation, associate low voltage switchgear, approximately 6,000 feet of new ductbank, IT infrastructure, structural and foundations, and other site work. Approximate value: $60M to $90M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidders and interested parties may also participate in the meeting via teleconference at 1 669 900 9128. At the meeting, the Port will provide information related to the Port's insurance requirements, NDSLBUP requirements, and will answer questions regarding the proposed project, submittal requirements and the selection process.

Post-Bid

Power Plant

$90,000,000.00

Public - City

New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
435
Active Projects
201
Bidding Soon
3,281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

September 30, 2025

Project location map

1 Airport Dr, Oakland, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.