Site work for a bridge / tunnel in Roberts, Montana. Completed plans call for site work for a bridge / tunnel.
1. The work generally consists of: Site 1 - Grove Creek Road: Install three (3) open-bottom arch culverts in parallel, overtop geogrid stabilized shallow foundation. Site 2 - Meeteetse Trail: Install tied-concrete block mat low-water crossing with upstream and downstream riprap protection. Contract Time will be 32 CALENDAR days with the Notice to Proceed being issued no earlier than March 17th, 2024 (weather dependent) and following receipt of all required jurisdictional agency permits. All construction schedules shall be substantially complete and ready for OWNER's use and pre-final inspection by Friday, April 18, 2025. All construction schedules shall be finally complete and ready for OWNER's use and final inspection by Friday, April 25, 2025. All construction schedules shall be finally complete and ready for final payment within (30) calendar days of Substantial Completion. The CONTRACTOR shall pay the OWNER $1,000.00, for each calendar day or part of a day that expires after the time specified for Substantial Completion of any construction schedule(s) until the Work is substantially complete. The CONTRACTOR shall also pay the OWNER $250, for each calendar day or part of a day that expires after the time specified for Final Completion and payment until the Work is finally complete. The following additional information, if applicable shall be submitted in the CONTRACTOR's bid proposal unless otherwise specified: B. The Certificate Regarding Debarment form (SECTION 00 73 03) shall be included with each bid. C. The Byrd Anti-Lobbying Amendment Certification (SECTION 00 73 03) shall be included with each bid. D. MBE/WBE Subcontractor solicitation information form (SECTION 00 73 03) shall be included with each bid. There will not be a pre-bid conference. No bid will be read or considered which does not fully comply with the above provisions as to Bond and Licenses, and any deficient bid submitted will be resealed and returned to the Bidder immediately. The OWNER reserves the right to hold and bid securities for a period not to exceed thirty (30) days and to hold the three low bids and bid securities for a period not to exceed sixty (60) days from the date of the bid opening. The OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of these periods, waive any informality in any bid, and to reject the bid of any party who has been delinquent or unfaithful in the performance of any former contract with the OWNER. Carbon County, Montana is an Equal Opportunity Employer. Contract Time: BASE BID: Contract Time will be 32 CALENDAR days with the Notice to Proceed being issued no earlier than March 17th, 2024 April 25, 2025. All construction schedules shall be finally complete and ready for final payment within (30) calendar days of Substantial Completion. Question Deadline: 01/28/2025 at 5:00 PM MT Tyler Lindbloom, P.E. Interstate Engineering, Inc. 1610 Poly Drive, Billings, Montana 59102 (Engineer), and cite the GROVE CREEK CULVERT CROSSING
Bid Results
Bridges / Tunnels
$316,766.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 4, 2025
March 17, 2025
Multiple Locations, Roberts, MT
Related To This Project
Roberts, MT
Bid Date: Feb 11 2025
Roberts, MT
Bid Date: May 20 2024
Roberts, MT
--
Roberts, MT
Bid Date: Feb 16 2023
Roberts, MT
Bid Date: Sep 01 2022
Roberts, MT
Bid Date: Nov 30 2023
Helena, MT
Bid Date: Feb 06 2025
Helena, MT
Bid Date: Feb 10 2025
Sidney, MT
Bid Date: Feb 10 2025
Deer Lodge, MT
Bid Date: Feb 06 2025
Chinook, MT
Bid Date: Feb 12 2025
Missoula, MT
Bid Date: Feb 27 2025
Bozeman, MT
Bid Date: Feb 25 2025
Shelby, MT
Bid Date: Feb 06 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.