BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 24, 2025 at 7:00 PM

Updated February 7, 2025

Site work for a mixed-use development in Pierre, South Dakota. Completed plans call for site work for a municipal facility.

The Project includes the following Work: Construction of a landfill cell consisting of clearing and grubbing, excavation and installation of the recompacted clay liner, geotextile, drainage layer installation, leachate and stormwater conveyance systems, litter fencing and access roads. The Project has an expected duration of 212 days from Notice to Proceed to Final Completion. Each bid must be accompanied by a Bid security made payable to the OWNER in the form of a certified check, bank money order or a Bid Bond, issued by a surety meeting the requirements of 6.01 and 6.02 of the General Conditions. The amount of the Bid price shall be equal to: a. Five (5) percent of the BIDDER s maximum Bid price if the bid security is in the form of a certified check or bank money order. b. Ten (10) percent of the Bidder s maximum Bid price if the bid security is in the form of a Bid Bond. The successful BIDDER will be required to furnish a Performance Bond and Payment Bond as described in Section 00 62 13.13 and 00 61 13.16. Requirements concerning the qualifications of BIDDERS are described in Section 00 21 13 Instructions to Bidders. The low responsive BIDDER will be required to certify to compliance with the American Iron and Steel provision of the Consolidated Appropriations Act of 2014. This certification form may be found on page AIS-1 of the State Revolving Fund (SRF) General Conditions and must be included in the Bidding Documents. Please be advised that waivers or exemptions from the American Iron and Steel provision that cite International Trade Agreements DO NOT comply with the Consolidated Appropriations Act of 2014 as it applies to the SRF programs. Claims from suppliers that the American Iron and Steel provision does not apply to certain products based on the International Trade Agreement exemptions of the Consolidated Appropriations Act of 2014 will not be accepted. BIDDERS will be required to comply with the President s Executive Order No. 11246 as amended. The requirements for BIDDERS and Contractors under these orders are explained in the Bidding Documents. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138. The requirements for BIDDERS and Contractors under this regulation which concerns utilization of Disadvantaged/Minority Business Enterprises (DBE/MBE) and Women s Business Enterprises (WBE) are explained in the Bidding Documents. The DBE/MBE and the WBE goals for participation in this contract in terms of percentage of contract value are as follows: MBE 1.0 percent; WBE 4.0 percent. Davis Bacon and Related Acts wages apply to this project. All provisions relative to those acts must be met. The City of Pierre reserves the right to waive irregularities and to reject any and all bids. Question Deadline 01/30/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: To: Garrett Williams, P.E., garrett.williams@hdrinc.com CC: The City of Pierre 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all Bidding Documents holders registered with the Issuing Office. Questions receiv

Post-Bid

Municipal

$600,000.00

Public - City

Site Work

13

21

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 10, 2025

Project location map

2800 E Park St, Pierre, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.