Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 16, 2025 at 8:00 PM
Updated May 17, 2025
Site work for a water / sewer project in Redwood City, California. Completed plans call for site work for a water / sewer project.
The Midpeninsula Regional Open Space (District) is pleased to announce the opportunity to bid on the Bathtub Loop Drainage Upgrade Project. The project consists of reshaping and improving the drainage features of approximately 1.2 miles of existing ranch road that will later service pedestrians, bicyclists, and equestrians. The road is in poor condition due to deficient or non-existent drainage features in tandem with moderate vehicle and grazing usage. The scope of work shall include road shaping/grading for drainage elements and erosion control, subgrade preparation, placement and compaction of Class II aggregate base, installation of stabilization fabric, and installation of new ditch relief culverts. The Bathtub Loop Drainage Upgrade Project consists of reshaping and improving the drainage features of approximately 1.2 miles of existing ranch road that will later service pedestrians, bicyclists, and equestrians. The road is in poor condition due to deficient or non-existent drainage features in tandem with moderate vehicle and grazing usage. The scope of work shall include road shaping/grading for drainage elements and erosion control, subgrade preparation, placement and compaction of Class II aggregate base, installation of stabilization fabric, and installation of ditch relief culverts as further detailed and described herein as the Contract Documents. Total project cost has been estimated to be approximately $400,000. Question Deadline 02/26/2025 at 12:00 PM PT For additional information, contact Sean Yao, Capital Project Manager I, Midpeninsula Regional Open Space District, 5050 El Camino Real, Los Altos, CA 94022-1404; (650) 772-3645 or syao@openspace.org. The project site is located within the La Honda Creek Open Space Preserve, located roughly 3.5 miles north of the town of La Honda and approximately 2.8 miles south of the intersection of Highway 35/Skyline Boulevard and Highway 84/La Honda Road. The project site is accessible off Highway 84/La Honda Road via a private road adjacent to the Red Barn site at La Honda Creek Preserve.
Award
Water / Sewer
$392,897.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
May 15, 2025
Highway 35 Skyline Boulevard and Highway 84 La Honda Road, Redwood City, CA
Related To This Project
Redwood City, CA
Bid Date: Feb 04 2025
Redwood City, CA
Bid Date: Feb 12 2025
Redwood City, CA
Bid Date: Feb 11 2025
Redwood City, CA
Bid Date: Feb 26 2025
Redwood City, CA
--
Redwood City, CA
Bid Date: Mar 11 2025
Redwood City, CA
--
Redwood City, CA
--
Redwood City, CA
Bid Date: Jan 28 2025
Redwood City, CA
Bid Date: Mar 10 2025
Redwood City, CA
Bid Date: Mar 06 2019
Redwood City, CA
--
Redwood City, CA
Bid Date: Dec 04 2024
Redwood City, CA
Bid Date: Dec 10 2024
Redwood City, CA
Bid Date: Feb 18 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
