EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 10, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Redwood City, California. Completed plans call for site work for a water / sewer project.

Under California Laws and Regulations, the Authority shall inform all prime contractors of public works, to the extent feasible, of relevant public work requirements. Therefore, SVCW hereby advises all bidders that the successful bidder shall: 1. Employ the appropriate number of apprentices on the job site as set forth in California Labor Code 1777.5; 2. Provide workers' compensation coverage, as set forth in California Labor Code Sections 1860 and 1861; 3. Keep and maintain the records of work performed on the Project, as set forth in Labor Code Section 1812; Each Bid must conform and be responsive to the Notice to Contractors, the Plans and Specifications, and all other documents comprising the Contract Documents. Each Bid shall be presented under sealed cover and shall be accompanied by a certified check made payable to the Authority or a Proposal Guarantee Bond in an amount not less than ten (10) percent of the Bid amount. The check or bond shall be given as a guarantee that the Bidder will execute the Contract in conformance with the form of Agreement contained in the Contract Documents and will furnish the bonds and insurance policies as specified therein within twenty (20) days after notification of the award of the Contract to the successful Bidder. The Authority reserves the sole right to reject any and all Bids and to waive any informality in a Bid. Bid RFI cutoff: By 12:00:00 p.m. on February 28, 2025

Post-Bid

Water / Sewer

$600,000.00

Public - City

Site Work

24

17

7

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Control, Field Quality Control Procedures, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Grouting
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas and Liquid Storage, Gas and Liquid Storage Equipment

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
114
Bidding Soon
1,851
All Active Projects
876
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

April 10, 2025

img_map_placeholder

1400 Radio Rd, Redwood City, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2 Water Air Gap

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.