EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 24, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Redwood City, California. Completed plans call for site work for a water / sewer project.

The Midpeninsula Regional Open Space (District) is pleased to announce the opportunity to bid on the Bathtub Loop Drainage Upgrade Project. The project consists of reshaping and improving the drainage features of approximately 1.2 miles of existing ranch road that will later service pedestrians, bicyclists, and equestrians. The road is in poor condition due to deficient or non-existent drainage features in tandem with moderate vehicle and grazing usage. The scope of work shall include road shaping/grading for drainage elements and erosion control, subgrade preparation, placement and compaction of Class II aggregate base, installation of stabilization fabric, and installation of new ditch relief culverts. The Bathtub Loop Drainage Upgrade Project consists of reshaping and improving the drainage features of approximately 1.2 miles of existing ranch road that will later service pedestrians, bicyclists, and equestrians. The road is in poor condition due to deficient or non-existent drainage features in tandem with moderate vehicle and grazing usage. The scope of work shall include road shaping/grading for drainage elements and erosion control, subgrade preparation, placement and compaction of Class II aggregate base, installation of stabilization fabric, and installation of ditch relief culverts as further detailed and described herein as the Contract Documents. Total project cost has been estimated to be approximately $400,000. Question Deadline 02/26/2025 at 12:00 PM PT For additional information, contact Sean Yao, Capital Project Manager I, Midpeninsula Regional Open Space District, 5050 El Camino Real, Los Altos, CA 94022-1404; (650) 772-3645 or syao@openspace.org. The project site is located within the La Honda Creek Open Space Preserve, located roughly 3.5 miles north of the town of La Honda and approximately 2.8 miles south of the intersection of Highway 35/Skyline Boulevard and Highway 84/La Honda Road. The project site is accessible off Highway 84/La Honda Road via a private road adjacent to the Red Barn site at La Honda Creek Preserve.

Post-Bid

Water / Sewer

$400,000.00

Public - State/Provincial

Site Work

11

9

59

9

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Dewatering, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Backhoes, Bulldozers
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
105
Bidding Soon
1,741
All Active Projects
807
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2025

May 15, 2025

img_map_placeholder

Highway 35 Skyline Boulevard and Highway 84 La Honda Road, Redwood City, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bathtub Loop Drainage Upgrade Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.