BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 12, 2025

Site work and paving for a road / highway in Seymour, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

State Let Construction Contract For Questions Call: Zachary Husen 848 Us 380 West Graham Tx 76450 (940) 549-0676 Length: 0 Mi Sbe Goal: 0.0% Time for Completion: 100 Working Days Guaranty: 100,000.00 County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Baylor 0156-06-066 Us 183 Us 82 C 156-6-66 Cr 218 Length: Baylor 0562-08-008 Us 277 Us 183 C 562-8-8 Us 82 Length: Baylor 0562-08-007 Near Cr 718 Us 277 C 562-8-7 Us 183 Length: Baylor 0157-01-080 Fm 2395 Us 277 C 157-1-80 Near Cr 718 Length: TXDOT - Surfacing/Roadway Restoration - US 82 For the preconstruction conference submit a work schedule; temporary water pollution control plan; material sources; the person responsible for the SW3P; written utility coordination plan; certification statements; request for proposed subcontractors and letters designating the project superintendent, safety officer, and payroll officer at the preconstruction conference. All recipients of federal financial assistance are required to comply with various nondiscrimination laws, including Title VI of the Civil Rights Act of 1964, as amended (Title VI). Title VI forbids discrimination against anyone in the United States on the grounds of race, color, or national origin by any agency receiving federal funds. The Texas Department of Transportation, as a recipient of federal financial assistance, and under Title VI and related statutes, ensures that no person will on the grounds of race, religion (where the primary objective of the financial assistance is to provide employment in accordance with 42 USC 2000d-3), color, national origin, sex, age, or disability be excluded from participation in, be denied the benefits of, or otherwise be subjected to discrimination under any Department programs or activities. The purpose of this Special Provision is to implement the Department's policy of ensuring that SBEs have an opportunity to participate in the performance of Contracts. If the SBE goal is greater than zero, Section 2.1., "Article A--SBE Goal is Greater than Zero," will apply to this Contract; otherwise, Section 2.2., "Article B--No SBE Goal," will apply. The percentage goal for SBE participation in the work to be performed under this Contract will be in accordance with the proposal.

Bid Results

Roads / Highways

$5,952,851.00

Public - State/Provincial

Paving, Site Work

47

3

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
13
Bidding Soon
165
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

April 8, 2025

Project location map

US-82, Seymour, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.