BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2025 at 7:00 PM

Updated March 7, 2025

Site work and paving for a road / highway in Houston, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

State Let Construction Contract Area Engineer contact information for this project follows: Area Engineer Hamoon Bahrami, P.E. 713-934-5902 hamoon.bahrami@txdot.gov Assistant Area Engineer William Burch, P.E. 713-934-5915 william.burch@txdot.gov For Questions Call: Hamoon Bahrami 14838 Northwest Freeway Houston Tx 77040 (713) 934-5902 Length: 81.373 MI Dbe Goal: 8.0% Time for Completion: 135 Working Days Guaranty: 100,000.00 ------------------------------------------------------------------------------ County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Harris 0027-13-257 Fort Bend County Line Ih 69 F 2025(497) Clay Street Length: 15.585 Harris 0720-03-157 Timbertech Lane Sh 249 F 2025(497) Hollister Road Length: 8.981 Harris 0598-01-111 Blodgett Street Sh 288 C 598-1-111 Brazoria County Line Length: Harris 0720-06-006 Bs 249-b North Sh 249 F 2025(497) Bs 249-b South Length: Harris 0027-15-030 Ih 69 Ss 527 F 2025(497) Elgin Street Length: 0.907 Harris 3256-04-083 Fm 521 Sl 8 F 2025(498) North Garden Street Length: Fort Bend 1415-02-055 Westpark Drive Fm 1464 F 2025(498) Sh 99 Length: 7.361 Harris 0271-06-139 Fort Bend County Line Ih 10 F 2025(497) Sh 6 Length: 10.176 Harris 0177-11-166 Clay Street Ih 69 F 2025(497) Ih 10 Length: 1.803 Harris 0271-07-351 Sh 6 Ih 10 F 2025(497) Hogan Street Length: 10.52 Harris 3256-02-120 Hollister Road Sl 8 F 2025(497) Mesa Drive Length: Harris 1006-01-092 Enchanted Creek Drive Fm 529 F 2025(497) Charles Road Length: Harris 3256-01-130 North Garden Street Sl 8 F 2025(497) Hollister Road Length: 24.786 Harris 0110-06-163 Northew Street Ss 261 F 2025(497) West Little York Road Length: 1.254 TXDOT - Landscape Development - IH 69

Award

Roads / Highways

$3,952,210.00

Public - State/Provincial

Paving, Site Work

248

3

2

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
378
Active Projects
128
Bidding Soon
3,750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

April 7, 2025

Project location map

I-69, Houston, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.