BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 7, 2025 at 7:00 PM

Updated February 8, 2025

Site work and paving for a civil project in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

In general, this work consists of: Contractor shall acquire all permits and provide copies to LAN as a prerequisite to starting work. Replace wet well and valve vault access hatches and install metal safety gratings. Temporary bypass pumping for lining of wet well with cementitious lining, including bypass pumping for lift station rehabilitation to provide continuous sewer service diverted around the lift station to during rehabilitation. Removal and relocation of quick disconnect assembly with bypass fitting aboveground including 6-inch cam lock fitting, 6-inch plug valve, 8-inch flexible coupling, and 8-inch to 6-inch reducer. Remove existing 8-inch elbow and replace with 8-inch tee fitting. Prevent infiltration on wet well walls by chemical grout injections. Lining of wet well interior and roof with an Engineer approved cementitious lining system, including cleaning, removal, and disposal of sediment, grit, sludge, and unsound concrete and surface preparation and application of 1-inch Engineer approved cementitious material for extremely harsh environments. Line wet well interior with Engineer approved epoxy coating. Removal of existing 8-inch ductile iron wet well piping. Installation of 8-inch type 316 stainless steel wet well piping including any bends, fittings, reducers, guide rails, supports, and all other appurtenances. Reseat and reseal pump stands. Remove and replace pump stands only as directed by Engineer. Surface preparation and recoating of existing piping, valves, and 6-inch vent pipes. Install new mesh screen over vent pipe. Remove and replace existing 8-inch check valves and gate valves as indicated on plans. Fill existing grade to elevation of existing lift station concrete pad with gravel. Remove existing tree intruding on lift station fence and grind to the stump. Site restoration, including removing and replacing concrete pavement, and driveways; and damaged turf, plants, shrubs, trees, and fences, as required. Pre bid meeting info : A mandatory pre-bid conference for prospective bidders will be held at the office of Clear Lake City Water Authority, 900 Bay Area Blvd., Houston, Texas 77058 It is the responsibility of the contractor bidding the project to ensure the accuracy of the reproduction of all bid documents and construction drawings. This responsibility includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the unit bid quantities and/or bid amount.

Bid Results

Water / Sewer

$234,469.00

Public - City

Paving, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

7

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
193
Bidding Soon
3,401
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

March 6, 2025

Project location map

19220 Space Center Blvd, Houston, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.