BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2025 at 7:00 PM

Updated May 2, 2025

Site work and paving for a civil project in Slinger, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Project involves the installation of storm water improvements at the Slinger Speedway site, including grading of the infield of the track, 470 LF of storm sewer pipe installation, catch basins, and end section, installation of a Contech CDS hydrodynamic separator structure, asphaltic concrete paving, erosion control, and restoration. This project also includes two mandatory alternate bids, the first one involving 465 tons of asphaltic paving and 900 tons of crushed base aggregate in the infield of the track, and the second one involving cured in place storm sewer pipe lining of 210 L.F. of 10-inch storm sewer. Est. Completion Date: July 1, 2025 Pre-Qualification :Yes A Bidder's qualification statement must be delivered to Village of Slinger at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to Village of Slinger equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Village of Slinger as liquidated damages.

Award

Water / Sewer

$184,787.00

Public - City

Paving, Site Work

9

17

2

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
116
Bidding Soon
1,551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

Project location map

280 Cedar Creek Rd, Slinger, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.