BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2025 at 7:00 PM

Updated January 28, 2025

This is a service / maintenance or supply contract in Lapeer, Michigan. Contact the soliciting agency for additional information.

Aggregate Hauling Quantities & Locations Maps and quantity sheets showing the locations and the amount of aggregate to be placed at each location will be provided before the work is to start. Also, a work schedule will be provided to coordinate work between the contractor and the Road Commission. Locations, quantities and schedules will be updated and revised as necessary. Protection & Restoration of Property The contractor shall restore, at his own expense, any public or private property damaged or injured in consequence of any act or omission on his part or on the part of his employees or agents, to a condition similar and equal to that existing before such damage or injury was done. If the contractor neglects to repair or make restorations, the Engineer may after 48 hours notice to the contractor, proceed to make such repairs or restorations, and will deduct the cost thereof from any monies that are or may become due to the contractor. At county owned pits, the Contractor shall keep the entrance gate closed and locked at all times except during operation. Contractor's Responsibility for Work The contractor shall be responsible for any and all damages that the work may sustain prior to its acceptance and shall rebuild, repair, restore and make good at his own expense, all injuries and damages to any portion of the work by the action of the elements or from any cause whatsoever prior to its acceptance. Utilities It shall be the responsibility of the contractor to protect utilities at all times which are shown on the plans, designated by the Engineer, or encountered during the contract. The contractor shall notify the owners of the utilities as to his starting date of construction and the contractor shall conduct his operations so as to interfere as little as possible with utilities or any public authority on or near the work. (Miss Dig) Completion Date Completion date for all items of work listed in this proposal is November 1 or as approved by Engineer. Purchase Orders Purchase orders are required for all purchases. This number must be given to vendor at the time of order placement and referenced on all packing lists, invoices, and other correspondence. Failure to follow these requirements may result in delay or non-payment of invoices. Delivery Time The inability of a vendor to deliver material within the agreed upon delivery time shall be cause to utilize alternate vendors.

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
124
Bidding Soon
2,226
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2025

February 26, 2025

Project location map

Multiple Locations, Lapeer, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.