Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 26, 2025 at 8:00 PM
Updated May 27, 2025
Renovation of an educational facility in Kingston, Ontario. Completed plans call for the renovation of a educational facility.
Built in 1973, John Orr Tower ("JOT") is a 16-story apartment building containing 123 one bedroom apartments, each with a balcony. Contractor Scope of Work: A summary of the project scope contained within the Issued for Tender Package is as follows: - Replacement of the existing 5kV load break switch - Replacement of the 450kVA transformer - Replacement of the main 208/120 volt normal-power switchboard - Replacement of the main 208/120 volt emergency-power panel board - Replacement of the emergency generator - Replacement of the bus duct that rises up through the entire building JOT is part of Queen's Community Housing and has full-time tenants year-round. lengthy and/or numerous power shutdowns will not be tolerated and power will need to be restored at the end of each working day. Considerable thought will have to be put into temporary power as well as sequencing of work in order to minimize power shutdowns and risk of unplanned outages. Preferred Schedule: Projected Start Date: Contractor can start work immediately upon contract execution (tentatively March 2025) Project Substantial Completion Date: TBD based on projected equipment lead times at time of tender. Deadline for QuestionsFriday, February 7, 2025 by 4:00 PM ET
Award
Educational
$2,960,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2025
May 30, 2025
244 Hargreaves WY, Kingston, ON
Related To This Project
Kingston, ON
Bid Date: Feb 20 2025
Kingston, ON
Bid Date: Nov 25 2021
Kingston, ON
Bid Date: May 04 2021
Kingston, ON
Bid Date: Apr 13 2021
Kingston, ON
Bid Date: Apr 20 2021
Kingston, ON
Bid Date: Apr 15 2021
Kingston, ON
--
Kingston, ON
--
Kingston, ON
Bid Date: Feb 19 2025
Kingston, ON
--
Kingston, ON
Bid Date: Feb 04 2025
Kingston, ON
--
Kingston, ON
Bid Date: Jan 29 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
