EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2025 at 8:00 PM

Updated October 1, 2024

Site work, paving and renovation of a mixed-use development in Gainesville, Florida. Completed plans call for the renovation of a 10,200-square-foot educational facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Task Order award will be made on March 4th, 2025. SUMMARY OF WORK: The proposed work for the auditorium interior renovations at Gainesville High School includes, but is not limited to, the following: Removal and replacement of theater lighting and AV systems with new systems, new acoustical treatment in the auditorium, addition/reconfiguration of entry vestibules in the lobby to serve the balcony, new finishes and lighting in the lobby, new house lighting, new flooring throughout the lobby and auditorium, refinish of ceiling over balcony only, and new entry storefront. TIME OF COMPLETION. Time is of the essence. Task Order award will be made on March 4th, 2025. The Notice to Procure & Assess will be issued shortly thereafter. The Notice to Proceed will be issued on June 3rd, 2025. The Work shall be Substantially Complete no later than sixty (60) calendar days from the date of the Notice to Proceed. Final Completion shall be fourteen (14) calendar days following Substantial Completion. PAYMENT/PERFORMANCE Bonds in the form prescribed by AIA Document A312, in the amount of 100% of the Task Order amount, shall be required for quotations over $200,000. LIQUIDATED DAMAGES in the amount of $500.00 per day shall be paid by qualified Offeror to SBAC in accordance with RFP #24-27.

Award

Educational

$1,115,032.00

Public - County

Paving, Renovation, Site Work

33

28

14

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants, Acoustical Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Entrances and Storefronts, Aluminum-Framed Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Portland Cement Plastering, Gypsum Board, Tiling, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Storage Specialties, Lockers
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Planting Preparation, Soil Preparation

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
51
Bidding Soon
981
All Active Projects
484
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

June 3, 2025

img_map_placeholder

1900 NW 13th St, Gainesville, FL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Gainesville High School Auditorium Interior Renovations and Bus Loop Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.