Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 8, 2025 at 8:00 PM
Updated April 9, 2025
Site work and renovation of a mixed-use development in Gainesville, Florida. Completed plans call for the renovation of a educational facility; for site work for a educational facility; water / sewer project; and water / sewer project.
SUMMARY OF WORK: The proposed work for the AHU replacements for buildings 11 & 12, as well as the installation of an EHPA gas generator at the Sidney Lanier Center includes, but is not limited to, the following: This project includes the replacement of designated air handling units serving buildings 11 and 12 of the Sidney Lanier Center. Project includes demolition and replacement of various Dx type split air handling units. Existing underground refrigerant piping to be abandoned and replaced with new above ground refrigerant line. Provide all new refrigerant piping above ground. The existing controls will be replaced and upgraded with a new building automation which shall be connected to the existing SBAC BAS network. Project to include full cleaning of existing duct systems in building 11 and building 12. Upgrade HVAC electrical per plans and in coordination with final AHU submittals. Install a new natural gas 500 kW generator and pad and required infrastructure to provide standby power for Buildings 11 & 12. RFI deadline is 5pm Tuesday, January 28, 2025.
Award
Educational
$2,373,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2025
September 2, 2025
312 NW 16th Ave, Gainesville, FL
Related To This Project
Gainesville, FL
Bid Date: Feb 18 2025
Gainesville, FL
--
Gainesville, FL
Bid Date: Feb 26 2025
Gainesville, FL
--
Gainesville, FL
Bid Date: Feb 10 2025
Gainesville, FL
Bid Date: Feb 26 2025
Gainesville, FL
Bid Date: Mar 06 2025
Gainesville, FL
Bid Date: Feb 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
