BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2025 at 7:00 PM

Updated March 1, 2025

Site work and asbestos abatement for a mixed-use development in Columbia, Missouri. Completed plans call for site work for a educational facility; for asbestos abatement for a educational facility; and water / sewer project.

Questions regarding the scope of work should be directed to Jason Hunter with PRVN at (319) 430-2496 or jhunter@prvninc.com. Questions regarding commercial conditions should be directed to Jennifer Sullivan at (573) 882- 8376 or sullivanjl@missouri.edu. A Diversity Participation goal of 10% MBE, 10% WBE, DBE and Veteran; 3% SDVE has been established for this contract. a. The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on the Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (1) Project consists of, but is not limited to, o Structural refurbishment of existing steam chase from utility tunnel to SMH-101. o Structural refurbishment of steam chases to Whitten Hall and Mumford Hall (by add alternate). o Structural refurbishment of SMH-101. o Demolition of steam and condensate piping and supports in chases and SMH-101. o New steam and condensate piping, valves, anchors, and supports in chases and SMH-101. o Replacement of storm sewer piping along the west and south sides of Whitten Hall and along the west and north sides of Memorial Union. o Replacement of water services. o Replacement of site lighting and associated conduit and circuits in the courtyard. o Replacement of the ice melt system in the north Memorial Union ADA entrance. o Demolition and reconstruction of the ADA ramp on the east side of the Memorial Union. o Restoration of glycol ice melt system in ADA ramp. o Installation of new light by ADA ramp. o Insulation of steam and condensate utilities in the chases, buildings, and SMH-101. o Spot tuckpointing on Memorial Union exposed north and west foundations. o Installation of waterproofing on exposed surfaces of the Memorial Union north and west foundations. o Asbestos abatement of chase and SMH waterproofing, and chase and SMH piping insulation. (2) Demolition consists of, but is not limited to, site clearing, partial demolition of structures, fencing, paving, demolition of steam and condensate utilities, and obstructions as required to complete the work. The Owner reserves the right to waive informalities in bids and to reject any and all bids.

Award

Educational

$2,487,000.00

Public - State/Provincial

Asbestos Abatement, Site Work

36

16

15

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
73
Bidding Soon
578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

April 21, 2025

Project location map

518 Hitt St, Columbia, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.