BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2025 at 7:00 PM

Updated February 25, 2025

Renovation of an educational facility in Perrysburg, Ohio. Completed plans call for the renovation of a educational facility.

2025 Electrical Improvements Electrical Improvements Owens Community College Wood County EDGE Participation Goal: Encouraged but not required . Domestic steel use is required per ORC 153.011. Contract Estimated Cost General Contract (Lead, Electrical) Base Bid $500,000.00 Alternate #1 Capacity Increase - ADD $32,000.00 Alternate #2 Spare Main Breaker - ADD $12,000.00 Alternate #3 IR Testing Windows - ADD $6,500.00 Alternate #4 Additional Excavation - ADD $7,500.00 Alternate #5 Unit Sub Transformer Removal - ADD $30,000.00 Alternate #6 New Surge Protection Devices - ADD $30,000.00 Alternate #7 Veterans Hall Panelboard Replacements - ADD $36,000.00 And any proper combination submitted on Bid Form A. The Work of Project is defined by the Contract Documents and consists of but not limited to the following: 1. Construct new underground conduit ductbanks that include handhole and tie-in to existing. 2. Finish and install new pad mounted transformer(s). 3. Modify existing primary circuit 12kV cables including terminations with field testing by NETA certified technician(s). 4. Remove identified existing switchgear(s), cables, conduits, etc. 5. Perform power system switching operations coordinated with the Owens Community College school calendar and staff scheduling requirements. 6. Replace indicated panelboards in Collage Hall; perform indicated testing of existing feeder circuits. 7. Coordinate with and participate in bi-weekly construction project meetings with the Engineer and Owner's representatives. 8. Facilitate and coordinate required State of Ohio Department of Commerce Electrical inspections. Notice to Proceed March 18, 2025 Substantial Completion August 14, 2026 Final Completion September 18, 2026 Project Closeout October 23, 2026

Post-Bid

Educational

$500,000.00

Public - State/Provincial

Renovation

26

10

8

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
179
Bidding Soon
2,194
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 21, 2025

Project location map

30335 Oregon Rd, Perrysburg, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.