BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2025 at 7:00 PM

Updated January 28, 2025

This is a service / maintenance or supply contract in Tacoma, Washington. Contact the soliciting agency for additional information.

Summary From the 2024 Masterplan report for the Sprinker Recreation and Community Center, develop the design and engineering for Phase 1 of the building. Designs will be developed to construction documents sufficient for public bid. This work includes facilitating public outreach to support the design, supporting grant acquisition, and providing design documents sufficient for permitting and bidding for construction. Question Deadline 01/30/2025 at 4:00 PM PT All questions must be submitted within the County's Online Provide design and engineering services to implement Phase 1 of the 2024 Masterplan report for Sprinker Recreation Center. The work will include review of the current master plan (2024), seismic evaluation (2024), building energy model (2022), existing conditions, public input, and Parks staff input. The project will include a public process consisting of three open public meetings. The successful team will be responsible for preparing all materials for and facilitating the public meetings. It is anticipated that the first meeting will orient the public to the project and gather initial comments and concerns, the second meeting will present and gather feedback on multiple differing concepts for the major design elements, and the third meeting will be a presentation of a preferred schematic design and its major elements to confirm public consensus. Following the public process, the successful team will support grant acquisition and develop construction documents. The preferred design will be developed to be implemented into construction anticipated to begin in 2027. The County reserves the right to accept or reject any or all submitted SOQs, and to waive as informalities any irregularities, and to contract as the best interest of the County may require. The County also may reject SOQs that are non-responsive or that are submitted by non-responsible firms. The method of Contractor Selection has not been Determined at this time

Conceptual

Fitness / Rec Centers

$600,000.00

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
48
Bidding Soon
1,503
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

Project location map

521 Military Rd S, Tacoma, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.