BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2025 at 7:00 PM

Updated February 26, 2025

Renovation of an educational facility in Oshawa, Ontario. Completed plans call for the renovation of a educational facility.

The Durham College (the "Institution") is seeking proposals for H-Wing AHU DX Cooling Coil Replacement and Several Pump Replacements at Multiple Locations Proponents are cautioned that the ability to complete the Work within the stipulated time period will be one of the factors considered in the award of this opportunity. The schedule will require weekend work to accommodate continued facility operations. Upon commencing work on site, all work must continue until completion without delay or work stoppage unless instructed otherwise by the Institution and to accommodate continued facility operations. The Proponent shall perform the work on a Monday to Friday basis between the hours of 8:00 am and 4:00 pm., and on Saturdays and Sundays (with Durham College approval) between the hours of 8:00am and 7.00 pm., unless otherwise directed by the Institution. The Institution may require that work be restricted at certain times, and will provide a minimum of 3 days written notice of such times. The Proponent shall refrain from work on Statutory Holidays recognized by the Institution. Under special circumstances, approval may be given for work on Statutory Holidays, at the discretion of the Institution. The Proponent will submit written notification at least four (4) days in advance of the Statutory Holiday on which he desires to work, indicating the location and nature of the work to be performed. The Proponent must obtain written permission from the Institution authorizing work on a specific Statutory Holiday. Work shall be completed in accordance with the following schedule: Estimated Commencement Date: Week of February 10, 2025. Total Completion Date: May 30, 2025. The Proponent will be required to provide all labour, material and equipment and direct his subcontractors and suppliers to work the number of shifts and days that are necessary to meet the Institution's schedule. Proponents shall allow in their Stipulated Price for all premium time and other costs as necessary to meet the required completion date. Documents can be obtain from https://www.biddingo.com/dashboard/bid/1/11003901/40199828/verification

Award

Educational

$200,000.00

Public - State/Provincial

Renovation

12

5

20

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
221
Bidding Soon
4,904
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

March 7, 2025

Project location map

Multiple Locations, Oshawa, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.