Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 2, 2025 at 8:00 PM
Updated April 3, 2025
Site work and paving for a mixed-use development in Frankfort, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Board of Education, Frankfort Community Consolidated School District 157-C will receive sealed bids for the 2025 Summer Work at Grand Prairie Elementary School, according to Contract Documents and Bid Specifications prepared by FGM Architects Inc., 1211 West 22nd Street, Suite 700 Oak Brook, Illinois 60523. PROJECT DESCRIPTION The project consists of, but is not necessarily limited to, sealcoating and restriping asphalt lots, drives, walkways, and decorative fence installation at Grand Prairie Elementary School. All sealed bids should be addressed to Frankfort School District #157-C and clearly marked on the outside as "2025 Summer Work", as appropriate. CONTRACT TYPE Bids will be based on a single lump sum General Construction Contract, with any applicable alternate bids considered individually, as may be in the best interest of the Board of Education. Bid Security is required in the amount of ten percent (10%) percent of Project Proposal, made payable unconditionally to the Owner. Security shall be either certified check, cashier's check, or a bid bond issued by a surety licensed to conduct business in the State of Illinois. Within ten (10) days after notification of award of contract, the successful Contractor shall furnish a Performance Bond in the amount of one hundred percent (100%) of the contract and the payment of all obligations arising thereunder, using a form similar to the AIA Form 312, or one acceptable to the Owner. The performance bond will become a part of the contract. The Owner reserves the right to accept or reject any or all bids, to waive any informalities in any bid, or to make awards in the best interests of the district. The Owner also reserves the right to award a partial amount of the specification rather than the entire amount, or alternates as it deems appropriate. All bids submitted shall be valid for a period of at least sixty days from the date of bid opening; the only alterations or adjustments allowed will be those approved by the Board of Education. Each bidder shall submit with his proposal a list of no less than four different construction projects that have been completed within the last four years that relate to the scope and type of work being specified in the bid documents.
Award
Roads / Highways
$40,280.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2025
March 7, 2025
10480 Nebraska, Frankfort, IL
Related To This Project
Frankfort, IL
Bid Date: Feb 05 2025
Frankfort, IL
Bid Date: Feb 14 2025
Frankfort, IL
Bid Date: Feb 27 2025
Frankfort, IL
Bid Date: Apr 03 2025
Frankfort, IL
Bid Date: Mar 31 2025
Frankfort, IL
--
Frankfort, IL
Bid Date: May 08 2025
Frankfort, IL
Bid Date: May 08 2025
Frankfort, IL
Bid Date: Jan 31 2025
Frankfort, IL
Bid Date: Nov 21 2024
Frankfort, IL
Bid Date: Nov 24 2025
Frankfort, IL
Bid Date: Nov 13 2024
Frankfort, IL
Bid Date: Oct 11 2024
Frankfort, IL
Bid Date: Oct 31 2024
Frankfort, IL
Bid Date: Oct 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
