Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published January 29, 2025 at 7:00 PM
Updated February 8, 2025
Renovation of an educational facility in Maryville, Missouri. Completed plans call for the renovation of a educational facility.
Garrett-Strong Switchgear Replacement A. Scope: The project includes all labor, materials, excavation, hoisting, lifts, related equipment, temporary power, tools and supervision necessary for the Garrett-Strong Switchgear Replacement project on the campus of Northwest Missouri State University at Maryville, MO. The scope includes, but is not limited to disconnecting and demolishing the existing medium voltage unit substation (USS) and close-coupled low-voltage switchgear; intercepting the existing medium voltage feeder in the tunnel leading to Garrett-Strong and extending it to a new exterior pad-mounted transformer provided by the contractor; providing a new 2000-amp exterior main switch in Nema 3R enclosure; providing a mew 2000-ampmain distribution switchboard in the lower mechanical room at the same location as the existing switchboard and feeder from the exterior main switch; reconnecting existing feeders to the new switchboard. The project also includes demolishing an existing exterior-mounted junction box and feeder to the existing low-voltage switchboard currently being used to back-feed the switchboard during temporary power during outages through the use of the University-owned portable generator; providing a new exterior wall-mounted generator docking station and a feeder to a new manual transfer switch provided by the contractor; providing a new emergency distribution panelboard and feeder from the manual transfer switch to isolate and energize loads supported by the University-owned generator during utility outages. B. MBE/WBE/SDVE Goals: MBE 10%, WBE 10% & SDVE 3% Note: Only MBE/WBE firms certified by a State of Missouri public entity, and SDVE(s) meeting the requirements of Section 34.074, RSMo, and 1 CSR 30-5.010, as of the date of bid opening, can be used to satisfy the MBE/WBE/SDVE participation goals for this Project. Question Deadline 01/31/2025 at 5:00 PM CT
Post-Bid
Educational
$300,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2025
March 6, 2025
800 University Dr, Maryville, MO
Related To This Project
Maryville, MO
Bid Date: Feb 13 2025
Maryville, MO
Bid Date: Feb 13 2025
Maryville, MO
Bid Date: Feb 05 2025
Maryville, MO
Bid Date: Feb 18 2025
Maryville, MO
Bid Date: Feb 18 2025
Maryville, MO
Bid Date: Feb 24 2025
Maryville, MO
Bid Date: Apr 11 2025
Maryville, MO
Bid Date: Mar 06 2025
Maryville, MO
Bid Date: Feb 04 2025
Maryville, MO
Bid Date: Jan 30 2025
Maryville, MO
Bid Date: Jan 13 2025
Maryville, MO
Bid Date: Jan 23 2025
Maryville, MO
Bid Date: Jan 07 2025
Maryville, MO
Bid Date: Dec 20 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed