BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Site work and asbestos abatement for a mixed-use development in Maryville, Missouri. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Roth Environmental Consultants, Inc. (Owners Representative) is pleased to announce that the Maryville R-II School District (Owner) is requesting bids in conjunction with asbestos abatement at two (2) schools located within the District. The schools consist of Eugene Field Elementary School and Maryville High School. This project consists of floor tile (FT) removal in the High School and thermal insulation in the Eugene Field Elementary School. In some cases, there may be two layers of floor tile (FT). The locations and totals may be seen in the walk-thru. The two schools are; Eugene Field Elementary School is located at 418 E. 2nd Street, Maryville, Missouri 64468. Maryville High School is located at 1503 S. Munn, Maryville, Missouri 64468 ROTH will be the PM and hygienist for the project. Thermal Insulation is present above a plenum in the former kitchen and hallways. Total amounts of materials are identified, however, add-ons for additional abatement will be addressed through unit pricing, as applicable. Mapping is enclosed and bears the square footage of each school to be abated. Starting date is May 14, 2025 and runs through May 23, 2025 for Eugene Field Elementary. Start time for the High School may run concurrently, but is no later than May 23, 2025 and runs through June 6, 2025. Of note: If the contractor wishes to pursue the removal of ACM materials at both schools, this is acceptable to the owner, however, the completion date of June 6th must be adhered to in order to allow the owner to reinstall new flooring. General: this section includes all Work necessary to reduce airborne fiber concentrations of asbestos to the specified level and maintain the specified asbestos control limits during the life of this Contract. The term "Contractor" when used in this specification shall always refer to the Asbestos Abatement Contractor. The term "Owners IH or Representative" shall refer to the third party Owner's Representative, independent of the Contractor, responsible for Work surveillance and who will be under separate contract to the Owner Bid Result Base Bid - Chemical Removal New Horizons Enterprises, $255,592.00 Base Bid Mechanical Removal Insco Environmental $313,850.0

Bid Results

Educational

$569,442.00

Public - City

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
1
Bidding Soon
548
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 14, 2025

Project location map

Multiple Locations, Maryville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.