Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2025 at 8:00 PM
Updated March 12, 2025
Site work for a playground / park / athletic field in Deerfield Beach, Florida. Completed plans call for site work for a playground / park / athletic field.
Scope of Work: This fixed contract is to provide all products, labor, tools, equipment, services and incidentals to repair mitered corners of the exiting gutter system, repair bends in metal gutter system, clean and prep gutters, reroute improper downspouts, and install new aluminum leaf guard flat screens on the entire system at Broward County's Quiet Waters Park Bald Eagle Shelter per the Specifications and Requirements for the Parks and Recreation Division. Deadline to submit Questions Jan 16th 2025, 5:00 PM EST All questions or clarification inquiries must be submitted through online by the Questions due date. The County will respond to questions in online (Messages section). ** site visit info : The vendor is cautioned that, although the site visit is optional, no modification or any changes will be allowed in the pricing because of the failure of the vendor(s) to have visited the site or to have attended the conference. To provide all products, labor, tools, equipment, services and incidentals to repair mitered corners of the exiting gutter system, repair bends in metal gutter system, clean and prep gutters, reroute improper downspouts, and install new aluminum leaf guard flat screens on the entire system at Broward County's Quiet Waters Park Bald Eagle Shelter. 1. The Contractor shall repair no fewer than twelve (12) mitered edges on gutters to be identified by the Project Manager. 2. The Contractor shall straighten bends and damaged gutters to allow proper leaf guard installation. 3. The Contractor shall clean gutters to allow for repairs and new additions. 4. The Contractor shall relocate two (2) existing downspouts to locations approved by the Project Manager. 5. The Contractor shall ensure all gutter additions shall be of a matching color and size (6") or alternate must be approved by the Project Manager. 6. The Contractorshall install gutter leaf guards/screens on entire system, approximately 630 linear feet +/- 10%. Guards/screens shall be designed to severely limit the number of leaves and pine needles entering the gutter system and shall fit over the gutters at an estimated width of 7" total. The Contractor is responsible for exact field measurements, and submittal of a bid will indicate that the Contractor is fully familiar with the work to be performed and has examined the site. 7. The Contractor shall ensure gutter leaf guards are made of aluminum or other metallic and non-corrosive material (i.e. stainless steel). No other metals or plastics will be accepted
Bid Results
Playgrounds / Parks / Athletic Fields
$500,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2025
March 13, 2025
401 S Powerline Rd, Deerfield Beach, FL
Related To This Project
Deerfield Beach, FL
Bid Date: Feb 11 2025
Deerfield Beach, FL
Bid Date: Nov 25 2025
Deerfield Beach, FL
--
Deerfield Beach, FL
--
Deerfield Beach, FL
Bid Date: Mar 07 2025
Deerfield Beach, FL
Bid Date: Mar 26 2025
Deerfield Beach, FL
Bid Date: May 21 2025
Deerfield Beach, FL
Bid Date: Apr 30 2025
Deerfield Beach, FL
--
Deerfield Beach, FL
--
Deerfield Beach, FL
--
Deerfield Beach, FL
--
Deerfield Beach, FL
Bid Date: Feb 26 2025
Deerfield Beach, FL
--
Deerfield Beach, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
