Published May 6, 2025 at 8:00 PM

Updated May 7, 2025

Site work for a water / sewer project in Brunswick, Georgia. Completed plans call for site work for a water / sewer project.

The Georgia Ports Authority (GPA) will receive sealed bids for East River Terminal Upgrade located at East River Terminal in Brunswick, Georgia. Bid must be accompanied by a bid security equal to 10 percent of bid sum. If a construction contract is awarded, successful bidder will be required to furnish performance and payment bonds, each equal in amount to contract sum. The proposed work consists of upgraded water mains for the fire protection systems at East River Terminal. The project is located at the East River Terminal, Brunswick, Georgia All technical questions related to the proposed work should be submitted in writing and directed to Architect/Engineer's Project Manager, Craig Zuck Questions related to Bidding Documents and Project site shall be directed in writing to A/E, attention Craig Zuck, email: czuck@moffattnichol.com. Interested parties are invited to attend a non-mandatory pre-bid meeting that will convene at 1:00 P.M., April 10, 2025, in the GP's Mayor's Point Conference Room, located at 1100 Bay St, Brunswick, GA. Bidders will have an opportunity to conduct an examination of the project site after the pre-bid meeting. Bidders may conduct additional examinations by contacting Craig Zuck at (912) 547-3977.

Post-Bid

Water / Sewer

$300,000.00

Public - State/Provincial

Site Work

58

14

6

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Quality Control, Contractor Quality Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Flooring, Access Flooring, Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning, Vibroflotation and Densification, Densification, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
60
Bidding Soon
880
All Active Projects
394
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 6, 2025

img_map_placeholder

Newcastle St, Brunswick, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.