Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 27, 2025 at 7:00 PM
Updated February 1, 2025
Site work for a sidewalk / parking lot in Naknek, Alaska. Completed plans call for site work for a sidewalk / parking lot.
The Project cost estimate is: $50,001 - $100,000 . The Department of Public Safety (DPS), Division of Administrative Services, is requesting quotes on a replacement poly dock for Alaska State Troopers and Alaska Wildlife Troopers located in Naknek, Alaska. All questions must be directed to the person listed above in writing via email. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DESCRIPTION OF WORK, REQUIRED COMPLETION DATE, LISTING OF ATTACHMENTS: Poly Dock replacement for old existing wooden float dock to be replaced by Spring of 2025. The dock shall have 3 sections that are 6'x24', 5 sections 6'x20' and 5 sections 4'x14' at the minimum for sizes to replace the existing layout. All hardware needed to assemble the dock, including piano hinges that have pipe in the hinges as the river gets around 3' waves on occasion, shall be provided. There are 4 cleats needed per finger float Also need 4 cleats for anchoring with 7' screw anchors, 4 cleats mid dock for anchoring. One piling box with rollers on all sides about 15" diameter and one piling articulates with an ice breaker. See attached diagram for more information. FOB Anchorage, AK to an address provided upon award. The dock and accessories will need to fit into 2 Connex's that are 8'x20'.
Post-Bid
Sidewalks / Parking Lot
$100,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2025
March 3, 2025
To Be Determined, Naknek, AK
Related To This Project
Naknek, AK
Bid Date: May 17 2024
Naknek, AK
Bid Date: Apr 24 2024
Naknek, AK
Bid Date: Mar 18 2022
Naknek, AK
Bid Date: May 17 2022
Kenai, AK
Bid Date: Feb 12 2025
Anchorage, AK
Bid Date: Feb 12 2025
Juneau, AK
Bid Date: Feb 13 2025
Kodiak, AK
--
Ketchikan, AK
Bid Date: Feb 14 2025
Denali Park, AK
--
Anchorage, AK
Bid Date: Feb 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
