BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 15, 2025

Site work and new construction of a water / sewer project in Marina, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The project involves the construction of three monitoring wells at depths of 470 feet, 960 feet, and 1,450 feet below ground surface (bgs), along with one dual-nested monitoring well at a depth of 1,300 feet bgs. The scope of work includes well development, drilling and installation of conductor casings with an outer annular seal, borehole drilling, geophysical surveying, assembly and installation of well casing and screens, and construction of surface completion. These wells are essential for guiding efforts to enhance groundwater remediation. The Project consists of constructing three monitoring wells at the 4th Avenue site, and one dualnested monitoring well at the "F" Tank site. The scope of work includes drilling and installation of conductor casings with an outer annular seal; borehole drilling; geophysical surveying; assembly and installation of well casing and screening; emplacement of annular materials; construction of surface completion; and well development. The primary point of contact for all technical questions related to the project during bidding is Charly Liscomb (Assistant Engineer). All questions must be submitted in writing to bliscomb@mcwd.org and copied to pbreen@mcwd.org. The Project will be funded in whole or in part by the following funding sources in addition to District funds: o Department of Water Resources (DWR) Sustainable Groundwater Management Act (SGMA) Implementation Grant The successful Bidder will be required to comply with all requirements associated with the DWR SGMA Implementation Grant funding in carrying out the Project, as listed in Appendix A. Since this Project is funded with DWR grant funds, the work must comply with all the provisions of the Labor Code regarding prevailing wages and all contracts subject to reimbursement from this Agreement to assure that the prevailing wage provisions of the Labor Code are being met. Attention is directed to the DWR SGMA Implementation Grant Round Requirements (Appendix A) section of the Contract Documents under Labor Code Compliance. Each bidder shall be a California licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following appropriate classification(s) of contractor's license(s), for the work bid upon, and must maintain the license(s) throughout the duration of the Contract: C-57 (Well Drilling Contractor). In addition, the successful bidder will be required to self-perform at least 50% of the work. Bid security shall be furnished in accordance with the Instructions to Bidders. Question Deadline 01/28/2025 at 5:00 PM PT All questions about the meaning orintent of the Bidding Documents are to be submitted to Owner in writing.

Post-Bid

Water / Sewer

$1,911,000.00

Public - City

New Construction, Site Work

8

12

20

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
6
Bidding Soon
879
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

April 7, 2025

Project location map

Multiple Locations, Marina, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.