BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated July 3, 2025

Renovation of a civil project in Milton, Delaware. Completed plans call for the renovation of a water / sewer project.

The work consists of furnishing and installing improvements to the Chandler Street Water Treatment Plant including piping, SCADA, motor controls, and electrical wiring, conduit, and equipment. Each BID must be accompanied by a BID BOND or Certified Check payable to the OWNER for ten (10) percent of the total amount of the BID. No Bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. The right is reserved, as the interests of the Town of Milton may appear, to reject any and all bids, to waive any informality in bids received, and to accept or reject any items of any bid. All questions, comments, or concerns are to be sent to Kristy Rogers, Town Manager, via email to krogers@ci.milton.de.us with copy to James Kersey, Water Superintendent (jkersey@ci.milton.de.us) and Brian Miller, PE (bmiller@pennoni.com).

Post-Bid

Water / Sewer

$579,000.00

Public - City

Renovation

23

16

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
2
Bidding Soon
839
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.