BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Renovation of a mixed-use development in Las Vegas, Nevada. Working plans call for the renovation of a fire / police facility; and pre-engineered storage facility.

**As of April 9, 2025 bids were canceled. No definite date for the rebid.** Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. The "Projects" of which the "Work" of the Contract is a part titled Brandy Warehouse Fire Department Tenant Improvements & Brandy Warehouse Roof Replacement and is located at 3550 West Harmon Avenue, Las Vegas, Nevada 89103. The "Work" is described in the Project Drawings and Divisions 01 through 32 of the Project Manual. Scope #1: Brandy Warehouse Fire Department - Tenant Improvements The work consists of the interior build out of an existing warehouse to include a new 7,859 square foot steel framed storage mezzanine, and new floor level office spaces, breakroom, utility rooms, secure storage, equipment storage, new restroom, renovation of existing restroom, and a new fire riser room. Increasing the size of the opening and replacing the existing west overhead door Improvements include access control, data, Wi-Fi, communications and alarm systems. Accommodations for new vehicle lift, compressed air equipment, and designated vehicle storage. Modifications to the existing fire sprinkler system per current code requirements. New storage racking equipment, storage shelving, and storage casework as noted. Scope #2: Brandy Warehouse - Roof Replacement The Work consists of the replacement of the entire roof of the building, removal of the existing roof system, rood deck, and batt insulation under the deck. Install new ridged insulation, roof decking, PVC roofing system, and R38 batt insulation under the deck. Removal and replacement of existing evaporative coolers, heat pump units, all associated utility hook ups, new curbs, pipe supports, and sleepers. Clean, repair, and adjust roof drains, structural repairs will also be required due to years of water infiltration due to the failing roof material. ESTIMATED COST: Scope #1: $3,334,500 - $3,510,000; Scope #2: $2,563,100 - $2,698,000. Question Deadline 02/04/2025 at 5:30 PM PT Doc note - Bid documents, specifications and drawings will be available on the NGEM System or a thumb drive (drive) can be picked up at the Clark County Government Center, 500 South Grand Central Parkway, Purchasing And Contracts Division, 4th Floor, Las Vegas, Nevada 89106 on TUESDAY, JANUARY 21, 2025. The drive will be provided at no charge. If the drive is to be mailed, there is an additional nonrefundable charge of $5.00. All checks are to be made payable to Clark County Department of Finance, Purchasing and Contracts Division. Hearing impaired customers may obtain information by calling TT/TDD: Relay Nevada toll free (800) 326-6868 the project consists of the interior build out of an existing warehouse to include a new 7,859 square foot steel framed storage mezzanine, and new floor level office spaces, breakroom,utility rooms, secure storage, equipment storage, new restroom, renovation of existing r estro o m , an d a n ew fireriserroom. -- increasing the size of the opening and replacing the existing west overhead door -improvements include access control, data, wifi, communications and alarm systems -- accommodations for new vehicle lift, compressed air equipment, and designated vehicle storage - modifications to the existing fire sprinkler system per current code requirements - new storage racking equipment, storage shelving, and storage casework as noted alternate 1 : prepare and paint the entire south exterior face of the building, including the face of the loading dock and stair handrails. (painting of all the exterior overhead doors and mandoors shall be part of the base bid) alternate 2: prepare and paint all the interior surface of the existing concrete warehouse walls

Final Planning

Fire / Police

$4,418,642.00

Public - County

Renovation

121

38

4

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
23
Bidding Soon
374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

October 9, 2025

Project location map

3550 W Harmon Ave, Las Vegas, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.