BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2025 at 8:00 PM

Updated May 6, 2025

Demolition and site work for a warehouse / distribution facility in Louisburg, North Carolina. Completed plans call for the demolition of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

Required exterior utility infrastructure will not be demoed in this project. Field verification will be required to identify unneeded utility infrastructure by contractor and owner prior to starting. Safe digging practices and rules must be followed, and NC 811 must be notified if digging occurs. Demo and remove all processing equipment and any related electrical equipment, panels, controls, conduit, hangars, gas lines, ducting, air lines, package chiller etc. from the premises located inside and outside of the warehouse. This demo will take place in areas "B", "C", "D", and "E" as shown in Exhibit A in the attached drawing. All demo and removed items listed in this request must be carefully removed from the property and disposed of at safe responsible recycling/solid waste facilities or other sites approved by Franklin County. All local, state, and federal disposal rules and regulations must be followed. Remove and dispose of electrical equipment, transformers, panels, control centers, conduits, high bay lighting, wiring, light switches, receptacles, emergency lighting, exit lighting, gas lines (to processing equipment only), ducting, air lines, HVAC equipment, heaters, identified exhaust fans, and loose metal parts throughout the building/site located in areas "BR", "C", "D", "E" shown in Exhibit A. Remove 7 garage doors. The garage door in area "F" will not be removed. Demo and remove interior control room equipment. No demo will take place in the workshop area of the warehouse that is shown in Exhibit A as "F". No demo will take place in or on the front office building shown in Exhibit A as aN, . Demo and remove truck scale shown in Exhibit A as "A1". _ It will be the contractor's responsibility to verify utilities are disconnected and to provide safe work areas for its employees and owner throughout the project. All areas are believed to be without power except for area "F". Contractor to include in proposal any items to exclude from demo. All OSHA guidelines shall be followed while performing this work on Franklin County property. Any questions should be directed Chris Jones, Facilities Management Director, by email at tjones@frnaklincounty or by phone 919-496-6155

Award

Warehouse / Distribution

$140,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
120
Bidding Soon
1,523
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2025

March 5, 2025

Project location map

424 T Kemp Rd, Louisburg, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.