Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 19, 2025 at 8:00 PM
Updated June 20, 2025
Renovation of a mixed-use development in Little Rock, Arkansas. Working plans call for the renovation of a medical facility.
Abbreviated Scope of Work: A. The objective of the project is to remove and replace the existing heating water infrastructure with a new system while offering minimal system interruption. The work will be completed in phases to help alleviate service interruptions. A brief description of each phase is listed below. The construction period of performance for this project is estimated to be 240 days. B. The work includes replacing steam pressure reducing stations, steam to hot water convertors, pumps, automatic valves, piping, and other boiler / hot water pumping system related equipment. Project will include extending piping system to permit tie-in for new equipment. This list is not exhaustive. Detailed construction and equipment plans have been provided with the packet. C. Phase 1 will consist of coordinating a shutdown of the high-pressure steam distribution to the steam pressure reducing station (PRS) in the 3rd level mechanical equipment room (MER). Demolish the existing PRS piping and valves and prepare the remaining connections for the new work. Install the new PRS piping and valves. Contractor to provide testing and demonstration of the new system for proper operation and response to outside air temperature inputs prior to turnover to the VA. Demolish existing medium pressure condensate flash tank at the mezzanine level of the energy center and prepare piping connections for new equipment. Install new medium pressure condensate flash tank in the same location. contractor to provide testing and demonstration of the new system for proper operation prior to turnover to the VA. D. Phase 2 will install (2) new steam-to-hot water heat exchangers, pumps, auxiliary equipment, and concrete housekeeping pad on the north side of the MER stairwell, as shown on the plans. Install new condensate piping to accommodate the new equipment and prepare for connection to existing piping. Contractor to test and demonstrate proper operation of the new system and response to control inputs prior to turnover to the VA. Demolish (2) existing steam-to-hot water heat exchangers, pumps, and auxiliary equipment, as shown on the plans. Demolish existing steam/hydronic/vent/condensate piping to the limits of demolition and prepare for connection to new piping. E. Phase 3 will install new steam-to-hot water heat exchanger, pump, and auxiliary equipment to serve the operating suites in pods 2B & 2F, as shown on the plans. Install new steam/hydronic/vent/condensate piping to accommodate the new equipment and prepare for connection to existing piping. demolish existing steam-to-hot water heat exchanger, pump, and auxiliary equipment, as shown on the plans. Demolish existing steam/hydronic/vent/condensate piping to the limits of demolition and prepare for connection to new piping. Install new automated crossover valve spool-piece between the primary HHW and operating room HHW distribution systems to permit full-temperature HHW to the operating room suites during the summer season. Extend the HHWS/R piping from the operating room heat exchanger to the pod 2F operating room suites. Contractor to provide testing and demonstration of the new system for proper operation and response to control inputs prior to turnover to the VA. F. Phase 4 will extend 1-1/2"HHWS/R piping from the 6th floor level in mechanical shaft NE-2 up to the 7th floor level and connect to existing HHWS/R piping to serve pod 7E. Contractor to provide testing and demonstration of the new system for proper operation prior to turnover to the VA. Demolish existing steam-to-hot water heat exchanger, pumps, and auxiliary equipment in the 7e penthouse. Demolish existing steam / hydronic / vent / condensate piping to the limits of the demolition. G. Work consists of the contractor providing all labor, equipment, transportation, materials, quality control and supervision necessary to conduct construction in accordance with the project specifications and drawings. H. The project is in an occupied and fully functioning hospital. All technical considerations associated with such, as well as appropriate noise, language and behavioral considerations shall be followed to the maximum extent. Quiet hours must be observed during non- business hours. Business hours are between 7a - 5p/7 days a week. This includes Asbestos Abatement. I. Contractor parking shall be coordinated with the Contracting Officer's Representative (COR). The contractor shall park in the designated spots only. Contractor parking will be located adjacent to the Grounds Building. VAAR 836.204| Disclosure of the magnitude of construction projects. Between $2,000,000 and $5,000,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Medical
$5,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2025
4300 W 7th St, Little Rock, AR
Related To This Project
Little Rock, AR
Bid Date: Feb 11 2025
Little Rock, AR
--
Little Rock, AR
Bid Date: Feb 05 2025
Little Rock, AR
Bid Date: Feb 06 2025
Little Rock, AR
--
Little Rock, AR
Bid Date: Jan 27 2025
Little Rock, AR
Bid Date: Feb 04 2025
Little Rock, AR
Bid Date: Feb 12 2025
Little Rock, AR
Bid Date: Sep 03 2025
Little Rock, AR
Bid Date: Nov 12 2025
Little Rock, AR
Bid Date: Feb 07 2025
Little Rock, AR
--
Little Rock, AR
Bid Date: Feb 04 2025
Little Rock, AR
Bid Date: Jan 23 2025
Little Rock, AR
Bid Date: Jan 14 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
