BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2025 at 7:00 PM

Updated January 28, 2025

Site work and paving for a bridge / tunnel in West Windsor, Vermont. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Est. Dollar Value: $38,100.00 Work to be performed includes field data collection, development of structure plans and complete bid package necessary to go out to bid for construction to replace a structure over the Hubbard River in Windsor. The Town of Windsor, Vermont, is soliciting engineering services for the design of a replacement crossing structure for Bridge #27 on Johnson Road (TH# 22) over the Hubbard Brook (see Attachment A: VTrans Inspection Report). Question Deadline 02/21/2025

Conceptual

Bridges / Tunnels

$38,100.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
315
Active Projects
182
Bidding Soon
2,268
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2026

Project location map

Johnson Rd, West Windsor, VT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.