Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2025 at 7:00 PM
Updated February 5, 2025
Site work for a water / sewer project in Surfside Beach, Texas. Completed plans call for site work for a water / sewer project.
The United States is accepting quotes for qualified individuals or firms to provide the Coast Guard with all labor, materials, and equipment necessary to extend seven piles on a floating dock at Station Freeport. Prior to submitting a quote, it is mandatory to examine the Statement of Work (SOW), and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Station Freeport. Location: United States Coast Guard Station Freeport 823 Coast Guard Dr. Freeport, TX 77541 Disclosure of the magnitude of construction projects. Between $25,000 and $100,000 The contractor shall begin performance within 10 calendar days and complete it within 45 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$100,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 3, 2025
March 5, 2025
823 Coast Guard Dr, Surfside Beach, TX
Related To This Project
Surfside Beach, TX
Bid Date: Mar 19 2025
Surfside Beach, TX
Bid Date: Sep 23 2025
Surfside Beach, TX
Bid Date: Dec 20 2024
Surfside Beach, TX
Bid Date: Dec 16 2024
Surfside Beach, TX
Bid Date: Jun 04 2024
Surfside Beach, TX
Bid Date: Nov 16 2023
Surfside Beach, TX
Bid Date: Dec 09 2021
Surfside Beach, TX
Bid Date: Dec 09 2021
Surfside Beach, TX
Bid Date: Feb 09 2023
Surfside Beach, TX
--
Tomball, TX
--
Nacogdoches, TX
Bid Date: Feb 19 2025
Tomball, TX
--
Nacogdoches, TX
Bid Date: Feb 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
