BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated April 1, 2025

Renovation of a mixed-use development in Medina, Ohio. Completed plans call for the renovation of a educational facility.

A. This project involves work in an existing operating facility and will require close communication with Owner with regard to access and work hours. Coordinate all work schedules with Owner prior to bidding. When project includes a Construction Manager, all work schedules shall also be coordinated with the Construction Manager, prior to bidding. B. All Drawings as well as the Specifications for all Divisions shall be defined as the Contract Documents. Contractor shall review entire set of Contract Documents prior to bidding. C. Drawings and Specifications are to be considered as supplementing each other. Work specified but not shown, or shown but not specified, shall be performed or furnished as though mentioned in both the Specifications and the Drawings. D. Prior to submitting bid, Contractor shall examine all Drawings and Specifications to develop a complete understanding of the project scope. Contractor shall ask for clarifications during the pre-bid phase of the project. Failure to do so will not relieve the Contractor of their responsibility to perform all required work. E. Where the project scope involves renovations and additions, it is recommended that Contractors visit the site of the work and become familiar with the conditions affecting the installation. Submission of a Bid shall presuppose knowledge of such conditions and no additional compensation shall be allowed where extra labor or materials are required because of the lack of knowledge of these conditions. F. Bid shall include any special phasing requirements related to the construction work as described in the Contract Documents. MCCC lnterior Alterations for the Mccc Lnterior Alterations to the Main School Building Second Floor Classrooms/ Labs for Vison Care Project in Accordance With the Contract Documents Prepared by Clark & Post Architects, Lnc. All Bids Must Be Accompanied by a Bid Guaranty in the Form of Either a Bid Guaranty & Contract Bond for the Full Amount of the Bid (Including All Add Alternates) or a Certified Check, Cashier's Check, or an Irrevocable Letter of Credit in an Amount Equal to 10% of the Bid (Including All Add Alternaies), as Described in the Lnstructions to Bidders. No Bidder May Withdraw Its Bid Within 60 Days After the Bid Opening. Mccc Reserves the Right to Waive Irregularities in Bids, Reject Any or All Bids, and Conduct Such Investigation as Necessary to Determine Bidder Responsibility.

Award

Educational

$769,750.00

Public - City

Renovation

57

19

9

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
63
Bidding Soon
1,775
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

May 30, 2025

Project location map

1101 W Liberty St, Medina, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.