BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Site work and paving for a mixed-use development in Ukiah, California. Completed plans call for site work for a road / highway; for paving for a road / highway; service station / car wash facility; sidewalk / parking lot; sidewalk / parking lot; and service station / car wash facility.

Scope of Work shall include but not be limited to 1. Provide all labor, materials, and equipment to install Electric Vehicle Parking Stalls indicated on plans at two locations for a total of 24 Stalls. Work consists of saw cutting and demolition of concrete and asphalt, trenching and installation of conduit, installation of electrical panels, charging units, transformers and wiring, form work, concrete pads, installation of handicap signage, and parking lot striping. 2. The contractor shall provide a proposed work schedule within two (2) weeks of receipt of the fully executed contract and no later than two (2) weeks prior to the proposed start of the work. Upon acceptance of the proposed work schedule, the County shall issue the Notice to Proceed for the date proposed by the Contractor for the start of the work. 3. Work shall be completed no more than one hundred twenty (120) calendar days after the Notice to Proceed date. Question Deadline 02/12/2025 Questions to be considered for inclusion in an addendum must be in writing and in the hands of County not less than seven (7) days prior to bid opening date. Electric Vehicle Charging Parking Stalls Project 501 Low Gap Rd. 727 South State Street Ukiah, CA 95482. Pursuant to the provisions of the Labor Code of the State of California, the Department of Industrial Relations has made a determination of the rate of per diem wages to be paid on the prevailing rate of pay for regular, holiday and overtime work in the locality in which the public work is to be performed, for each craft, classification, or type of workman needed to execute the contract. All County of Mendocino projects greater than $1,000 require that contractors adhere to Prevailing Wage requirements (California Labor Code, Sections 1770 through 1775). B. Late bids will not be accepted. It is Bidder's responsibility to ensure that its bid is delivered and received at the location noted above on or before the date and hour set for the bid opening. LICENSE REQUIREMENT The license required for this Project is a California Contractor A General Engineering and/or a C-10 Electrical. A Bidder's Bond, Certified Check or Cashier's Check made payable to the County of Mendocino for an amount equal to at least ten percent (10%) of the bid amount shall accompany each bid. The above-mentioned bid security shall be given as a guarantee that the Bidder shall execute the contract if it be awarded to it in conformity with the contract documents and shall provide the surety bond or bonds required, sign the contract and commence work as set forth in the contract documents. Such guaranty to be forfeited should the Bidder to whom the contract is awarded fail to enter into the contract. Bidder agrees to commence work on or before a date to be specified in the written "Notice to Proceed" from County and to fully complete the project within one hundred twenty (120) calendar days from date of the written "Notice to Proceed". Bids may be withdrawn prior to, but not later than, the time of the bid opening. Successful Bidder is required to furnish a Labor and Material Payment Bond and a Performance Bond each in the amount equal to one hundred percent (100%) of the contract price. Said Bonds shall be obtained from a surety company satisfactory to County and the Bonds shall be submitted on the bond forms provided in section 00 61 13. In case of failure on the part of Contractor to complete the work within the time stipulated plus any duly authorized extension of time granted in writing by County, Contractor shall pay to County the sum of $250.00 per calendar day for each day's delay beyond the time prescribed as liquidated damages, but not as a penalty. The language in the paragraph of the General Conditions entitled "Time of Completion and Liquidated Damages" is incorporated herein.

Bid Results

Service Station / Car Wash

$566,977.00

Public - County

Paving, Site Work

19

12

5

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

March 21, 2025

Project location map

Multiple Locations, Ukiah, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.