Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 6, 2025 at 7:00 PM
Updated November 7, 2025
Renovation of a municipal facility in Dunkirk, New York. Design plans call for the renovation of a municipal facility.
As of November 6, 2025, an engineer has been selected for the project. Bidding is estimated for early 2026 and construction is estimated for spring of 2025. *The closed solicitation has been included below for reference: The Consultant Scope of Work primarily includes, and may not be limited to, completion of the following key tasks: Program Management Project scheduling and management. Attendance at and coordination of periodic project team meetings. Coordination and oversight of all applicable standards and regulations, subcontractor management, and site inspections. Geotechnical Investigation Completion of the necessary soil investigations for a design assessment for the new access roadway, utilities, and turn lane. Performance of a Seismic Refraction Analysis to develop a rock profile along the new roadway/utility alignment to delineate the depth that contractors can. attending onsite meetings, consultation on groundwater and/or bedrock, observing proof rolling and drainage swale installation work. Wetland Delineation and Report Completion of a wetland delineation for the remaining approximately 5 acres that was previously not delineated in the due diligence phases due to changes in the project area. Completion of wetland and stream delineation which, includes review of onsite conditions, field delineation, and sub-meter GPS survey of delineation flags. Submittal of delineation results to US Army Corps of Engineers for a jurisdictional determination. Survey and Mapping Completion of survey and additional field topographical survey and base mapping suitable for the design of the NYSDOT required turn lane. Main Access Roadway Preliminary and Final Design Questions regarding the overall project and scope or requirements outlined in this RFP can submitted in writing to Crystal Erhard at email, Questions must be submitted by 3:30pm February 7, 2025. An addendum containing all questions and responses related to this RFP are anticipated to be posted to the County of Chautauqua Industrial Development Agency website by February 17, 2025. Qualified State-certified MWBEs are encouraged to submit proposals. This project is in part funded with a NYS FAST NY Grant via Empire State Development. The total MWBE utilization goals for this solicitation is 30% (15% MBE/15%WBE). Services under the agreement for engineering and construction management are budgeted not to exceed $1 Million. For this scope, services should exclude electric planning and engineering, which will be handled by National Grid. The total construction related costs associated with this project are estimated to be between $10 and $12 Million. The CCIDA intends to enter into an agreement on or around April 1, 2025 with an estimated term of between 18 and 24 months. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Design
Municipal
$12,000,000.00
Public - County
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2026
214 Central Ave, Dunkirk, NY
Related To This Project
Dunkirk, NY
Bid Date: Apr 14 2025
Dunkirk, NY
Bid Date: Jul 17 2019
Dunkirk, NY
Bid Date: Apr 16 2025
Dunkirk, NY
Bid Date: Jun 16 2021
Dunkirk, NY
Bid Date: Jun 17 2025
Dunkirk, NY
Bid Date: Jun 16 2021
Dunkirk, NY
Bid Date: Jun 02 2025
Dunkirk, NY
Bid Date: Jun 26 2025
Dunkirk, NY
Bid Date: Feb 27 2025
Dunkirk, NY
Bid Date: Jul 22 2020
Dunkirk, NY
Bid Date: Jul 22 2020
Dunkirk, NY
Bid Date: Nov 19 2024
Dunkirk, NY
Bid Date: Nov 05 2024
Dunkirk, NY
Bid Date: Aug 29 2024
Dunkirk, NY
Bid Date: Aug 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
