Published March 24, 2025 at 8:00 PM
Updated March 25, 2025
Site work and paving for a sidewalk / parking lot in Winchendon, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Project was awarded to Massachusetts Broken Stone Company for $345,251.28. Construction to begin in the spring. Furnishing all necessary labor, materials and equipment required for the reclamation, paving and pavement marking of the Rail Trail from the Center of Town to the Town line. Estimated Cost $350000. Contractor Qualification DCAMM Cert. and Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work to be performed under this Contract consists of furnishing all necessary labor, materials and equipment required for the reclamation, paving and pavement marking of the Rail Trail from the Center of Town to the Town line. The project is split into 3 sections of the trail as described below; Section 1 - Center of Town to Old Gardner Rd., pavement marking only Section 2 - Old Gardner Rd. to Commercial Drive, reclamation and pavement markings Section 3 - Town Line to Commercial Drive, reclamation and pavement markings Reclamation will consist of reclaiming the existing +/-9' bike path and re-paving with a new 10' wide path, from Old Gardner Rd to the Town Line. The work includes the reclaiming 12" of existing pavement and subbase and paving a 1.5" binder and 1.5" top course of HMA to maintain a uniform longitudinal and cross slope that will guarantee a puddle free surface with a smooth ride from Old Gardner Rd. to the Winchendon Town Line, approximately 2.15 miles. Also included in the scope, Contractor will be responsible for painting the longs lines, crosswalks, stop bars and lettering along the trail path from the Town line to the Center of Town. The work hours are 7:00am to 3:30 pm Monday - Friday excluding Town holidays. This project will require coordination with the City of Gardner DPW in order to access the Winchendon Town Line along the Rail Trail. Contractor will responsible for ensuring the coordination with the City. Due to the underpass constraint at the intersection of Commercial Drive and the Rail Trail (see page 4 of the plans) the only way to access Section 3, Town Line to Commercial Drive, is via the City of Gardner Entrance on Gardner Rd (Rt 140), see page 5 of the plans. In order to protect the bike path within the City of Gardner limits, all machinery must have rubber tires. Contractor will be required to mobilize at the Gardner entrance of the path and move the equipment approximately 1 mile north to the Winchendon Town Line. Incidental to this contract, as needed, are all advance construction warning signs, ramps at joints, cones, and barrels needed to insure the safety of the public. The Contractor will have no claim for required mobilizations or delay due to unforeseen circumstances associated with Town utilities. The Contractor shall provide his services within (2) two weeks of the date requested by the Town and will submit a project schedule of work activities. Deadline for the entire work shall be June 1, 2025.
Award
Sidewalks / Parking Lot
$345,251.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2025
March 10, 2025
Multiple Locations, Winchendon, MA
Related To This Project
Winchendon, MA
Bid Date: May 01 2025
Winchendon, MA
Bid Date: Jul 29 2025
Winchendon, MA
Bid Date: Aug 07 2025
Winchendon, MA
Bid Date: Aug 01 2025
Winchendon, MA
Bid Date: Aug 08 2025
Winchendon, MA
Bid Date: Sep 11 2025
Winchendon, MA
Bid Date: Aug 28 2025
Winchendon, MA
Bid Date: Dec 27 2024
Winchendon, MA
Bid Date: Dec 18 2024
Winchendon, MA
Bid Date: Dec 18 2024
Winchendon, MA
Bid Date: Dec 27 2024
Winchendon, MA
Bid Date: Nov 08 2024
Winchendon, MA
Bid Date: Jun 10 2021
Winchendon, MA
Bid Date: Jul 27 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.