BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 12, 2025

Demolition, site work and addition to an educational facility in Oklahoma City, Oklahoma. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

US Grant STEM Addition - Bid Package #02 For Bid Package #02, Work Includes: Doors & Hardware - Supply, Glass & Glazing, and Specialties. General Trade Inclusions: Line items listed below are typical or boilerplate in nature and shall be included in the base bid if supported and required by the contract documents unless noted otherwise. 1) Furnish all doors, frames, & hardware associated with the project aside from Aluminum doors, frames, & hardware. 2) Furnish all doors including, but not limited to wood doors, hollow metal doors, steel doors, storm doors, & composite doors. 3) Furnish all frames including, but not limited to hollow metal, steel, storm, rated, hollow metal window frames, & hollow metal cased openings. 4) Furnish all hardware as listed in the hardware schedule. Include all hinges, pivots, lock and latch sets, push/pulls, exit devices, closers, overhead holders/stops, wall and floor stops/holders, flush bolts, gasketing, thresholds, protection plates, cylinders and keys, power supplies, electrified hardware, anchors, astragals, glazing stops, door silencers, and weather sealants. 5) Furnish all doors with construction cores to allow the building to be lockable during construction. Include final keying for all locks and cylinders to existing or new system. 6) Include pre-finishing of doors as specified. 7) This Trade Contractor to provide all electric devices and power supplies. Installation & wiring by others. 8) All materials to be shipped FOB jobsite. Materials to be unloaded and placed in a location as directed by the CM with dunnage included. 9) Creation of the submittal package shall include coordination between the architectural plan pages and the applicable schedules. Discrepancies between the two shall be provided to the CM in RFI format. Failure to do so will result in replacement of the material in question at no expense to the owner or CM. 10) This Trade Contract includes all items of work covered by the specifications be they named, inferred, or normally performed by members of Trade Contractor's industry. For purposes of clarification, we may list items to be included in addition to those which are covered in the plans and specifications. 11) The Trade Contractor acknowledges and agrees that any recapitulation of the work to be performed shall be for the sole and exclusive purpose of clarifying the status of those items which are included in the Trade Contractor's scope of work. Items not specifically mentioned but are normally performed by members of the Trade's industry are included as part of the Trade Contractor's Scope of Work. 12) All work shall be accomplished using accepted methods and procedures of the highest recognized standards and shall be done in a neat and skillful manner, in accordance with applicable standards and codes and the requirements of the prime contract. 13) All work included in this trade contract shall be according to the project/progress schedule provided by the construction manager. This includes day and night work as required by project schedule. If the Subcontractor falls behind schedule in the submittal portion or the installation portion of this Subcontract through no fault of the Contractor or the Owner, the Subcontractor shall work overtime or perform shift work at no extra cost to Contractor as necessary to maintain the project schedule. 14) Trade Contractor shall understand when their scope of work is to be put in place and include all weather protective means as required. 15) Coordination and phasing of work as required by Crossland Construction Co. 16) Include all ADA requirements applicable to system(s) and project. 17) Include travel and mobilizations for field measuring. 18) Any damage, because of this Trade Contractor's work to adjacent existing structures, finishes, equipment or other tangible aspect of the project and repair, thereof, will be the responsibility of this Trade Contractor. - 8A Door Assemblies - Supply - 8C Glass & Glazing - 10A Specialties Attention to the following bid requirements: - Complete, sign and include Attachments A, B, C, D, & E found at the end of this bid package document along with your bid form with your sealed bid. - Cashier's check, certified check, or Surety Bid Bond for 5% of Base Bid required for all bids over $50,000. - Performance, payment, and maintenance bonds will be required by the lowest responsible bidder for any bid over $50,000. These costs are to be included in your bid amount. All Questions Shall Be Furnished in Writing via Email to: Renae Stoops Rstoops@ Crossland.com (918) 859- 3902 **Total/Overall Project Value Listed

Post-Bid

Educational

$15,000,000.00

Public - City

Addition, Demolition, Site Work

397

73

36

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
46
Bidding Soon
757
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

April 14, 2025

Project location map

5016 S Pennsylvania Ave, Oklahoma City, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.