Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 7, 2025 at 7:00 PM
Updated October 1, 2024
Demolition, site work, paving and new construction of a mixed-use development in Newport News, Virginia. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
UPC: 119217 The Project will construct the first phase of a full diamond interchange on I-64 at Denbigh Blvd. This project will install the I-64 westbound on-ramp and off-ramp, widen I-64 to support westbound ramps, install ramp intersection traffic signals, and widen Denbigh Blvd for ramp turn lanes. Denbigh Blvd/Warwick Ave & Denbigh Blvd/Jefferson Ave intersection improvements are also included that will provide new turn lanes and pedestrian accommodations. Widen northern abutment to accommodate the future bridge widening and remove and replace the existing T-Wall and associated existing geofoam as needed. The proposed project objectives include improving regional mobility and safety, increase local network access and alleviate congestion, support increase in demand from developed urban corridor. VDOT's current estimated contract value for this Project is approximately $56 million. Deadline to submit questions 02/12/2025 at 4:00 PM (prevailing local time) VDOT will respond to questions 02/20/2025 Anticipated RFP Release Date 05/13/2025 Technical Proposals are due 08/14/2025 at 4:00 PM (prevailing local time) Price Proposals are due 09/17/2025 at 4:00 PM (prevailing local time) Anticipated Award Date 10/15/2025 Final Completion 08/28/2029 All questions and requests for clarification regarding this RFQ shall be submitted to VDOT's POC in electronic format (submission by email is acceptable). No requests for additional information, clarification or any other communication should be directed to any other individual. No Oral Requests for Information Will Be Accepted A single 100% performance bond and a single 100% payment bond shall be provided regardless of any co-surety relationship. The method of contractor selection has not been determined at this time. VADOT - RFQ Contractor - I-64 Denbigh Boulevard Interchange Phase 1 Design-Build Project
Post-Bid
Roads / Highways
$56,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 10 - Specialties
Division 11 - Equipment
Division 21 - Fire Suppression
Division 23 - Heating Ventilating and Air Conditioning
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2025
November 6, 2025

Denbigh Blvd, Newport News, VA
Related To This Project
Newport News, VA
Bid Date: Feb 10 2025
Newport News, VA
Bid Date: Apr 03 2025
Newport News, VA
Bid Date: Mar 07 2025
Newport News, VA
Bid Date: Apr 04 2025
Newport News, VA
Bid Date: Mar 18 2025
Newport News, VA
Bid Date: Mar 25 2025
Newport News, VA
Bid Date: Mar 24 2025
Newport News, VA
Bid Date: Feb 21 2025
Newport News, VA
Bid Date: Jul 28 2016
Newport News, VA
--
Newport News, VA
Bid Date: Jan 14 2025
Newport News, VA
Bid Date: Jan 14 2025
Newport News, VA
Bid Date: Jan 16 2025
Newport News, VA
Bid Date: Feb 07 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
RFQ Contractor - I-64 Denbigh Boulevard Interchange Phase 1 Design-Build Project
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.