Site work for a water / sewer project in Yankton, South Dakota. Completed plans call for site work for a water / sewer project.

Segment 3 Transmission Improvements, Yankton, South Dakota USDA RD NO. 18-0001 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Jon Fischer, P.E. Stockwell Engineers, Inc. 201 Walnut Street Yankton, SD 57078 (605) 261-0361 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Bids which are not prepared and filed in accordance with Instructions to Bidders may be rejected. The Project includes the following Work: In general, the project consists of installing 3 miles of water transmission main, pressure reducing valves, a meter station, and air release manholes on the north side of Yankton, SD. The following trade work is anticipated: traffic control; erosion control; installation of water main; trenchless construction; and an inground premanufactured structure for pressure reducing valves and a meter station with communications & electric service. Bids are requested for the following Contract: Segment 3 Transmission Improvements, Owner anticipates that the Project s total bid price will be approximately $5,000,000 . The Project has an expected duration of 200 days The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Prospective Bidders may examine the Bidding Documents at the following locations on Monday through Friday between the hours of 8:00 am to 5:00 pm. B-Y Water District Stockwell Engineers, Inc. 31039 428 th Street 201 Walnut Street Tabor, SD 57063 Yankton, SD 57078 Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States. Question Deadline 04/17/2025

Bid Results

Water / Sewer

$858,167.00

Public - City

Site Work

152

7

21

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
43
Bidding Soon
424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

June 23, 2025

Project location map

Multiple Locations, Yankton, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.