BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 22, 2025

Site work for a water / sewer project in Honolulu, Hawaii. Completed plans call for site work for a water / sewer project.

SCOPE OF WORK: Furnish all labor, materials, equipment,and professional services. necessary to conduct the following for Base Honolulu: BASE ITEMS: Work includes but is not limited to: Determine the location of the blockage in the pipes connecting the shower, sink, and urinal in the men's restroom in Pier 4. Secure sewer and water lines to the restroom as required. Provide a Confined Space Certified member to enter the confined space adjacent to the suspected area of blockage. See attached image of the confined space in figure 1. In the confined space, remove the blockage in the pipe. If that is not feasible, remove and replace the pipe. If the confined space does not allow access to the site, begin work in the bathroom. Remove the tile and concrete flooring to gain access to the pipe. The current flooring and suspected floor area to be removed is shown in figure 2. The pipe is believed to be approximately 4 feet below the floor. Remove the blockage. If that is not feasible, remove and replace the clogged pipe. Pour new concrete to replace the flooring to match existing conditions and match the height of the existing floor. Install tile to match existing conditions. Tile must be submitted to and approved by the Project Manager (PM). Re-open sewer and water lines. LOCATION: Pier 4: 433 Ala Moana Blvd, Honolulu Hi. 96813, Honolulu Coast Guard Regional Exam Center Contracting Officer: Justin Hinkle (808) 842-2822, justin.n.hinkle@uscg.mil COR: DCCS John Treme (414) 510-5813, John.P.Treme@uscg.mil secondary COR: DC1 Colin Forey (808)590-6225, Colin.D.Forey@uscg.mil Site Visit: 30JAN25 at 10:00 AM. Must contact DCC John Treme to attend. please submit quote via SF-18 The period of performance for the resulting contract shall be completed 30 days of award.

Post-Bid

Water / Sewer

$90,000.00

Public - Federal

Site Work

4

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
11
Bidding Soon
263
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

March 24, 2025

Project location map

433 Ala Moana Blvd, Honolulu, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.