Published April 27, 2026 at 8:00 PM
Updated May 20, 2026
Site work and outdoor lighting for a transportation facility in Honolulu, Hawaii. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.
Goals for minority participation for each trade: 70.4% Goals for female participation in each trade: 6.9% Question Deadline 04/29/2026 at 2:00 PM HT All Request for Information (RFI) questions and Substitution Requests shall be submitted in HIePRO. The estimated cost of construction is $48,000,000.00. The scope of work consists of replacing the existing high pressure sodium high mast lights that illuminate the passenger terminal apron, cargo apron, various parking lots, and access and service roads at Kahului Airport and the passenger terminal apron, cargo apron, parking lot, and access road at Lanai Airport. The implementation of full cut-off light fixtures will minimize the impact on seabirds and ensure compliance with the Maui County Habitat Conservation Plan and with HRS Section 201-8.5 Night Sky Protection Strategy. Apron Light Replacement at Kahului Airport, Kahului, Maui, Hawaii, and Lanai Airport, Lanai City, Lanai, Hawaii, State Project No. As1037-12r, The State reserves the right to reject any or all proposals and to waive any defects in said proposals in the best interest of the public. All Request for Information (RFI) questions and Substitution Requests shall be submitted in PRO no later than March 6, 2026, at 2:00 p.m., HST. RFI questions received after the stated dline shall not be addressed. Substitution Requests received after the stated deadline shall not considered. Verbal RFI(s) shall not receive a response. All responses to RFI questions shall be wided for clarification and information only and issued by formal addendum. Any amendments ne solicitation shall be made by formal addendum and posted in HIePRO. If there is a conflict between the solicitation and information stated in the pre-bid conference, the meeting minutes, and/or the responses to RFI questions, the solicitation shall govern and control, unless as amended by formal addendum. The estimated cost of construction is $48,000,000.00. To be eligible for award, bidders shall possess a valid State of Hawaii General Engineering "A" license or a specialty "C-13" Electrical Contractor license prior to the award of contract.
GC Bidding
Transportation Terminals
$48,000,000.00
Public - State/Provincial
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2026
November 1, 2026
Multiple Locations, Honolulu, HI
Related To This Project
Honolulu, HI
Bid Date: Feb 25 2025
Honolulu, HI
Bid Date: Feb 07 2025
Honolulu, HI
Bid Date: Feb 25 2025
Honolulu, HI
Bid Date: Feb 03 2025
Honolulu, HI
Bid Date: Feb 20 2025
Honolulu, HI
--
Honolulu, HI
Bid Date: Feb 21 2025
Honolulu, HI
Bid Date: Feb 19 2025
Honolulu, HI
Bid Date: Mar 13 2025
Honolulu, HI
Bid Date: Feb 12 2025
Honolulu, HI
Bid Date: Feb 10 2025
Honolulu, HI
Bid Date: Mar 10 2025
Honolulu, HI
Bid Date: Mar 13 2025
Honolulu, HI
Bid Date: Jan 31 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.