BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 29, 2025 at 8:00 PM

Updated April 4, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Lake Lure, North Carolina. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://www.foxcarolina.com/2025/09/26/surprise-funds-will-help-construct-new-lake-lure-flowering-bridge/ LAKE LURE, N.C. (FOX Carolina) - The Flowering Bridge organization said some surprise funding will help rebuild an iconic pedestrian bridge between Lake Lure and Chimney Rock Village. The organization said FEMA unexpectedly announced dozens of Hurricane Helene-related recovery projects on Sept. 16, which included a grant for the bridge construction. The beloved Flowering Bridge was demolished over the summer after suffering irreparable structural damage during the hurricane. Plans for a new bridge were uncertain after officials said earlier in September that the FEMA funding they had already received would be needed for other infrastructure priorities like the dam, sewer system and public safety. “In addition to providing the much needed, safe pedestrian connector between our two towns for the the use of residents and visitors alike, the new bridge will once again tie together our east and west end gardens to allow us to begin restoring the Flowering Bridge to its past splendor,” the organization announced. Officials said the new grant will only go toward construction of the pedestrian walkway. The Flowering Bridge Organization is raising funds to rebuild the gardens and complete the Education Center. They expect to begin planting on both ends of the gardens in the coming weeks. ------------------------------------- Replace Bridge 800628 Over Lake Lure Dam and Broad River. County : Rutherford Route : SR 1306 (Bills Creek Road) Length (Miles) : 0.25 As of August 25, 2025, the project is in Conceptual status. Anticipated letting year is 2026. NC DOT - Replace Bridge -Bills Creek Road *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$20,800,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2028

Project location map

Bills Creek Rd, Lake Lure, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.